What the regulator requires
A measure is a specific action the regulator requires the water company to take at a named site — to investigate a problem, keep monitoring it, or physically fix it — each with a completion date. These are the legally binding measures on record for this catchment: what each requires, and what to watch.
These measures are legally binding. Each one is a dated, site-specific requirement the company must deliver.
The Water Industry National Environment Programme is how the Environment Agency turns statutory duties into named obligations at named sites, with a completion date attached. Where a measure requires a physical upgrade, the Agency writes the result into the site's environmental permit — and from that point the requirement is criminally enforceable.
The measure itself is public. What is not published is the water company's action to comply with it — its delivery is reported to the regulator and scored, but the underlying work, and whether a measure has actually resolved the problem on the ground, is not on the public record. What to watch is slippage: a measure can be re-dated or re-scoped, and until the permit is varied the obligation has not changed.
What the types mean
A physical upgrade — bigger storage, better treatment, more capacity. This is the only type that actually fixes the problem on the ground.
A study of the cause. It produces a report, not a repair — an investigation must lead to an improvement before anything changes.
Installing or running instruments to measure the problem. Necessary evidence, but on its own it fixes nothing — it too has to be followed by an improvement.
So an overflow whose only measures are investigations or monitoring is being looked at, not yet fixed. On the gaps page, only a measure that is still active counts as action — a measure completed while the overflow is still failing does not.
| Reference | Driver | Type | What it requires | Status | Attached to |
|---|---|---|---|---|---|
| 08TW100496 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) BARKWAY SEWAGE TREATMENT WORKS | Complete 2025-26 | Quin |
| 08TW100696 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) BISHOPS STORTFORD SEWAGE TREATMENT WORKS | Complete 2025-26 | Great Hallingbury Brook |
| 08TW100499 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) BUNTINGFORD SEWAGE TREAMENT WORKS | Complete 2025-26 | Rib (upper stretches, above confluence with the Quin) |
| 08TW100501 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) CHAPMORE END SEWAGE TREATMENT WORKS | Complete 2025-26 | Rib (from confluence with Quin to Lee Navigation) |
| 08TW100503 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) COTTERED SEWAGE TREATMENT WORKS | Complete 2025-26 | Beane (Source to Stevenage Brook) |
| 08TW100504 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) DEEPHAMS SEWAGE TREATMENT WORKS | Complete 2025-26 | Pymmes and Salmon Brooks - Deephams STW to Tottenham Locks |
| 08TW100507 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) HARPENDEN SEWAGE TREATMENT WORKS | Complete 2025-26 | Lee (from Luton Hoo Lakes to Hertford) |
| 08TW100508 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) HATFIELD (MILL GREEN) SEWAGE TREATMENT WORKS | Complete 2025-26 | Lee (from Luton Hoo Lakes to Hertford) |
| 08TW100509 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) HATFIELD HEATH SEWAGE TREATMENT WORKS | Complete 2025-26 | Pincey Brook |
| 08TW100512 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) LITTLE HALLINGBURY SEWAGE TREATMENT WORKS | Complete 2025-26 | Little Hallingbury Brook |
| 08TW100513 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) LUTON (EAST HYDE) SEWAGE TREATMENT WORKS | Complete 2025-26 | Lee (from Luton Hoo Lakes to Hertford) |
| 08TW100517 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) RYE MEADS SEWAGE TREATMENT WORKS | Complete 2025-26 | Stort and Navigation, Harlow to Lee |
| 08TW100518 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) STANDON SEWAGE TREATMENT WORKS | Complete 2025-26 | Rib (from confluence with Quin to Lee Navigation) |
| 08TW100519 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) STANSTED MOUNTFITCHET SEWAGE TREATMENT WORKS | Complete 2025-26 | Stort and Bourne Brook |
| 08TW100520 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) TAKELEY SEWAGE TREATMENT WORKS | Complete 2025-26 | Pincey Brook |
| 08TW100541 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) THERFIELD SEWAGE TREATMENT WORKS | Complete 2025-26 | Rib (upper stretches, above confluence with the Quin) |
| 08TW100543 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) WESTON (HERTS) SEWAGE TREATMENT WORKS | Complete 2025-26 | Beane (Source to Stevenage Brook) |
| 08TW100524 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) WHITWELL SEWAGE TREATMENT WORKS | Complete 2025-26 | Mimram (Whitwell to Codicote Bottom) |
| 08TW100525 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) WIDFORD SEWAGE TREATMENT WORKS | Complete 2025-26 | Ash (from confluence with Bury Green Brook to Lee) |
| 08TW101552 · a | U_MON4 | Monitoring | Install and run event-duration monitoring BARKWAY SEWAGE TREATMENT WORKS | Due 2026-27 | Quin |
| 08TW100292 · a | U_MON4 | Monitoring | Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a) BISHOPS STORTFORD SEWAGE TREATMENT WORKS (Last in Line Overflow off site) | Due 2026-27 | Great Hallingbury Brook |
| 08TW100301 · a | U_MON4 | Monitoring | Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a) BUNTINGFORD SEWAGE TREAMENT WORKS | Due 2026-27 | Rib (upper stretches, above confluence with the Quin) |
| 08TW100310 · a | U_MON4 | Monitoring | Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a) CHAPMORE END SEWAGE TREATMENT WORKS | Due 2026-27 | Rib (from confluence with Quin to Lee Navigation) |
| 08TW101554 · a | U_MON4 | Monitoring | Install and run event-duration monitoring COTTERED SEWAGE TREATMENT WORKS | Due 2026-27 | Beane (Source to Stevenage Brook) |
| 08TW101555 · a | U_MON4 | Monitoring | Install and run event-duration monitoring DEEPHAMS SEWAGE TREATMENT WORKS | Due 2026-27 | Pymmes and Salmon Brooks - Deephams STW to Tottenham Locks |
| 08TW100343 · a | U_MON4 | Monitoring | Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a) HARPENDEN SEWAGE TREATMENT WORKS | Due 2026-27 | Lee (from Luton Hoo Lakes to Hertford) |
| 08TW100345 · a | U_MON4 | Monitoring | Install and run event-duration monitoring HATFIELD (MILL GREEN) SEWAGE TREATMENT WORKS | Due 2026-27 | Lee (from Luton Hoo Lakes to Hertford) |
| 08TW101556 · a | U_MON4 | Monitoring | Install and run event-duration monitoring HATFIELD HEATH SEWAGE TREATMENT WORKS | Due 2026-27 | Pincey Brook |
| 08TW101460 · a | WFD_NDINV_WRFlow | Investigation | Investigate risk of deterioration Investiagte deterioration risk | Due 2026-27 | Lee (Tottenham Locks to Bow Locks/Three Mills Locks) |
| 08TW100360 · a | U_MON4 | Monitoring | Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a) LITTLE HALLINGBURY SEWAGE TREATMENT WORKS | Due 2026-27 | Little Hallingbury Brook |
| 08TW100031 · a | WFD_INV_WRFlow | Investigation | Further phase of investigation Lower Lee investigation | Due 2026-27 | Lea Navigation Enfield Lock to Tottenham Locks |
| 08TW100364 · a | U_MON4 | Monitoring | Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a) LUTON (EAST HYDE) SEWAGE TREATMENT WORKS | Due 2026-27 | Lee (from Luton Hoo Lakes to Hertford) |
| 08TW100448 · a | U_MON4 | Monitoring | Install and run event-duration monitoring RYE MEADS SEWAGE TREATMENT WORKS | Due 2026-27 | Stort and Navigation, Harlow to Lee |
| 08TW101559 · a | U_MON4 | Monitoring | Install and run event-duration monitoring STANDON SEWAGE TREATMENT WORKS | Due 2026-27 | Rib (from confluence with Quin to Lee Navigation) |
| 08TW100386 · a | U_MON4 | Monitoring | Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a) STANSTED MOUNTFITCHET SEWAGE TREATMENT WORKS | Due 2026-27 | Stort and Bourne Brook |
| 08TW101560 · a | U_MON4 | Monitoring | Install and run event-duration monitoring TAKELEY SEWAGE TREATMENT WORKS | Due 2026-27 | Pincey Brook |
| 08TW101561 · a | U_MON4 | Monitoring | Install and run event-duration monitoring THERFIELD SEWAGE TREATMENT WORKS | Due 2026-27 | Rib (upper stretches, above confluence with the Quin) |
| 08TW100401 · a | U_MON4 | Monitoring | Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a) WESTON (HERTS) SEWAGE TREATMENT WORKS | Due 2026-27 | Beane (Source to Stevenage Brook) |
| 08TW101562 · a | U_MON4 | Monitoring | Install and run event-duration monitoring WHITWELL SEWAGE TREATMENT WORKS | Due 2026-27 | Mimram (Whitwell to Codicote Bottom) |
| 08TW100404 · a | U_MON4 | Monitoring | Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a) WIDFORD SEWAGE TREATMENT WORKS | Due 2026-27 | Ash (from confluence with Bury Green Brook to Lee) |
| 08TW100144 · a | WFD_NDLS_Chem2 | No deterioration | new PFOS limit PFOS Harpenden STW | Due 2026-27 | Lee (from Luton Hoo Lakes to Hertford) |
| 08TW100147 · a | WFD_NDLS_Chem2 | No deterioration | new PFOS limit PFOS Rye Meads STW | Due 2026-27 | Stort and Navigation, Harlow to Lee |
| 08TW100074 · a | WFD_NDLS_Chem2 | No deterioration | Clavering STW, cypermethrin, 0.000406ug Reduce cypermethrin loading | Due 2026-27 | Stort (at Clavering) |
| 08TW100087 · a | WFD_NDLS_Chem1 | No deterioration | Manuden STW, cypermethrin, 0.000775ug Reduce cypermethrin loading | Due 2026-27 | Stort (at Clavering) |
| 08TW100096 · a | WFD_NDLS_Chem2 | No deterioration | Stantsed Mountfitchet STW, cypermethrin, 0.00073ug Reduce cypermethrin loading | Due 2026-27 | Stort and Bourne Brook |
| 08TW100132 · a | WFD_NDLS_Chem2 | No deterioration | Rye Meads STW, Nonylphenol, 0.38 ug Reduce Nonylphenol loading | Due 2026-27 | Stort and Navigation, Harlow to Lee |
| 08TW100110 · a | WFD_NDLS_Chem2 | No deterioration | Bishops Stortford STW, Nonylphenol, 0.39 ug Reduce Nonylphenol loading | Due 2026-27 | Great Hallingbury Brook |
| 08TW101545 · d | WFD_INV_CHEM | Investigation | PFOS investigation - Harpenden STW 4a Investigation to develop and trial a framework that meets statutory requirements | Due 2027-28 | Lee (from Luton Hoo Lakes to Hertford) |
| 08TW101545 · g | WFD_INV_CHEM | Investigation | PFOS investigation - Rye Meads STW 4a Investigation to develop and trial a framework that meets statutory requirements | Due 2027-28 | Stort and Navigation, Harlow to Lee |
| 08TW101456 · a | WFD_INV_PHYSHAB | Investigation | Complete fish pass options feasibility and take forward the preferred option to fish pass design resulting in approval from EA National Fish Pass Panel at GSK weir for construction in AMP 9 GSK weir | Due 2027-28 | Lee Navigation (Hertford to Fieldes Weir) |
| 08TW100007 · a | EE_INV | Investigation | Assess effectiveness of the Klawa bypass Klawa investigation | Due 2027-28 | Lea Navigation Enfield Lock to Tottenham Locks |
| 08TW101458 · a | WFD_INV_PHYSHAB | Investigation | Complete fish pass options feasibility and take forward the preferred option to fish pass design and approval by EA National Fish Pass Panel for Newmans Weir Newmans Weir | Due 2027-28 | Lea Navigation (Fieldes Weir to Enfield Lock) |
| 08TW101108 · un | EnvAct_INV4 | Investigation | Storm Overflows investigation Peterborough Road - Storm Overflows investigation | Due 2027-28 | Lee (Tottenham Locks to Bow Locks/Three Mills Locks) |
| 08TW101108 · do | EnvAct_INV4 | Investigation | Investigate the cause of the spills Storm Overflows investigation at AUCKLAND ROAD STORM TANKS SPS | Due 2027-28 | Lee (Tottenham Locks to Bow Locks/Three Mills Locks) |
| 08TW101108 · qa | EnvAct_INV4 | Investigation | Investigate the cause of the spills Storm Overflows investigation at Barkway STW | Due 2027-28 | Quin |
| 08TW101108 · cv | EnvAct_INV4 | Investigation | Investigate the cause of the spills Storm Overflows investigation at BEECH HALL CRESCENT, WALTHAMSTOW CSO | Due 2027-28 | Ching Brook |
| 08TW101108 · fv | EnvAct_INV4 | Investigation | Investigate the cause of the spills Storm Overflows investigation at BISHOP STORTFORD MAIN SPS | Due 2027-28 | Stort and Navigation, B Stortford to Harlow |
| 08TW101108 · ak | EnvAct_INV4 | Investigation | Investigate the cause of the spills Storm Overflows investigation at BRICKENDON STW | Due 2027-28 | Lee (from Luton Hoo Lakes to Hertford) |
| 08TW101108 · fw | EnvAct_INV4 | Investigation | Investigate the cause of the spills Storm Overflows investigation at BUNTINGFORD STW | Due 2027-28 | Rib (upper stretches, above confluence with the Quin) |
| 08TW101108 · fk | EnvAct_INV4 | Investigation | Investigate the cause of the spills Storm Overflows investigation at CHINGFORD STORM TANKS CSO | Due 2027-28 | Ching Brook |
| 08TW101108 · fl | EnvAct_INV4 | Investigation | Investigate the cause of the spills Storm Overflows investigation at CHURCH HILL ROAD, BARNET CSO | Due 2027-28 | Pymmes Brook upstream Salmon Brook confluence |
| 08TW101108 · hj | EnvAct_INV4 | Investigation | Investigate the cause of the spills Storm Overflows investigation at DEADMANS BRIDGE CSO | Due 2027-28 | Pymmes Brook upstream Salmon Brook confluence |
| 08TW101108 · fo | EnvAct_INV4 | Investigation | Investigate the cause of the spills Storm Overflows investigation at Deephams STW | Due 2027-28 | Pymmes and Salmon Brooks - Deephams STW to Tottenham Locks |
| 08TW101108 · jw | EnvAct_INV4 | Investigation | Investigate the cause of the spills Storm Overflows investigation at DUNSTABLE ROAD - BEECH ROAD CSO 2 UNPERMITTED CSO | Due 2027-28 | Lee (from Luton to Luton Hoo Lakes) |
| 08TW101108 · jx | EnvAct_INV4 | Investigation | Investigate the cause of the spills Storm Overflows investigation at DUNSTABLE ROAD - BEECH ROAD UNPERMITTED CSO | Due 2027-28 | Lee (from Luton to Luton Hoo Lakes) |
| 08TW101108 · jy | EnvAct_INV4 | Investigation | Investigate the cause of the spills Storm Overflows investigation at DUNSTABLE ROAD - FRANCIS STREET UNPERMITTED CSO | Due 2027-28 | Lee (from Luton to Luton Hoo Lakes) |
| 08TW101108 · gj | EnvAct_INV4 | Investigation | Investigate the cause of the spills Storm Overflows investigation at ESSENDON,HOLYWELL BRIDGE SPS | Due 2027-28 | Lee (from Luton Hoo Lakes to Hertford) |
| 08TW101108 · dr | EnvAct_INV4 | Investigation | Investigate the cause of the spills Storm Overflows investigation at FARM STORM TANKS,WALTHAMSTOW SPS | Due 2027-28 | Lee (Tottenham Locks to Bow Locks/Three Mills Locks) |
| 08TW101108 · gx | EnvAct_INV4 | Investigation | Investigate the cause of the spills Storm Overflows investigation at HADHAM MILL SPS | Due 2027-28 | Ash (from confluence with Bury Green Brook to Lee) |
| 08TW101108 · bn | EnvAct_INV4 | Investigation | Investigate the cause of the spills Storm Overflows investigation at HARPENDEN STW | Due 2027-28 | Lee (from Luton Hoo Lakes to Hertford) |
| 08TW101108 · bv | EnvAct_INV4 | Investigation | Investigate the cause of the spills Storm Overflows investigation at LITTLE HALLINGBURY STW | Due 2027-28 | Little Hallingbury Brook |
| 08TW101108 · bb | EnvAct_INV4 | Investigation | Investigate the cause of the spills Storm Overflows investigation at LUTON STW | Due 2027-28 | Lee (from Luton Hoo Lakes to Hertford) |
| 08TW101108 · fp | EnvAct_INV4 | Investigation | Investigate the cause of the spills Storm Overflows investigation at LYTTON ROAD SSO CSO | Due 2027-28 | Pymmes Brook upstream Salmon Brook confluence |
| 08TW101108 · lg | EnvAct_INV4 | Investigation | Investigate the cause of the spills Storm Overflows investigation at MELFORD ROAD, LONDON, E11 UNPERMITTED CSO | Due 2027-28 | Lee (Tottenham Locks to Bow Locks/Three Mills Locks) |
| 08TW101108 · de | EnvAct_INV4 | Investigation | Investigate the cause of the spills Storm Overflows investigation at MULBERRY COURT, HALL ROAD CSO | Due 2027-28 | Lee (Tottenham Locks to Bow Locks/Three Mills Locks) |
| 08TW101108 · lk | EnvAct_INV4 | Investigation | Investigate the cause of the spills Storm Overflows investigation at NETHERLANDS ROAD CSO UNPERMITTED CSO | Due 2027-28 | Pymmes Brook upstream Salmon Brook confluence |
| 08TW101108 · lo | EnvAct_INV4 | Investigation | Investigate the cause of the spills Storm Overflows investigation at OAK HILL PARK CSO UNPERMITTED CSO | Due 2027-28 | Pymmes Brook upstream Salmon Brook confluence |
| 08TW101108 · lq | EnvAct_INV4 | Investigation | Investigate the cause of the spills Storm Overflows investigation at PARK STREET - BAILEY STREET UNPERMITTED CSO | Due 2027-28 | Lee (from Luton to Luton Hoo Lakes) |
| 08TW101108 · lr | EnvAct_INV4 | Investigation | Investigate the cause of the spills Storm Overflows investigation at PARK STREET - OPP PARMEAD UNPERMITTED CSO | Due 2027-28 | Lee (from Luton to Luton Hoo Lakes) |
| 08TW101108 · bc | EnvAct_INV4 | Investigation | Investigate the cause of the spills Storm Overflows investigation at PARK TOWN SOUTH & WEST, LUTON CSO | Due 2027-28 | Lee (from Luton to Luton Hoo Lakes) |
| 08TW101108 · fq | EnvAct_INV4 | Investigation | Investigate the cause of the spills Storm Overflows investigation at PINKHAM WAY STORM SEWAGE O F, LONDON CSO | Due 2027-28 | Pymmes Brook upstream Salmon Brook confluence |
| 08TW101108 · cf | EnvAct_INV4 | Investigation | Investigate the cause of the spills Storm Overflows investigation at RYE MEADS STW | Due 2027-28 | Stort and Navigation, Harlow to Lee |
| 08TW101108 · cw | EnvAct_INV4 | Investigation | Investigate the cause of the spills Storm Overflows investigation at ST ANDREWS ROAD, BLACK HORSE LANE CSO | Due 2027-28 | Lee (Tottenham Locks to Bow Locks/Three Mills Locks) |
| 08TW101108 · ck | EnvAct_INV4 | Investigation | Investigate the cause of the spills Storm Overflows investigation at STANSTED MOUNTFITCHET STW | Due 2027-28 | Stort and Bourne Brook |
| 08TW101108 · df | EnvAct_INV4 | Investigation | Investigate the cause of the spills Storm Overflows investigation at STONEBRIDGE BROOK CSO | Due 2027-28 | Lee (Tottenham Locks to Bow Locks/Three Mills Locks) |
| 08TW101108 · co | EnvAct_INV4 | Investigation | Investigate the cause of the spills Storm Overflows investigation at TAKELEY STW | Due 2027-28 | Pincey Brook |
| 08TW101108 · cp | EnvAct_INV4 | Investigation | Investigate the cause of the spills Storm Overflows investigation at THERFIELD STW | Due 2027-28 | Rib (upper stretches, above confluence with the Quin) |
| 08TW101108 · gn | EnvAct_INV4 | Investigation | Investigate the cause of the spills Storm Overflows investigation at VAUXHALL MOTORS CSO | Due 2027-28 | Lee (from Luton to Luton Hoo Lakes) |
| 08TW101108 · gi | EnvAct_INV4 | Investigation | Investigate the cause of the spills Storm Overflows investigation at WEST END, ESSENDON SPS | Due 2027-28 | Lee (from Luton Hoo Lakes to Hertford) |
| 08TW101108 · ip | EnvAct_INV4 | Investigation | Investigate the cause of the spills Storm Overflows investigation at WESTON PARK CSO | Due 2027-28 | Lee (Tottenham Locks to Bow Locks/Three Mills Locks) |
| 08TW101108 · iq | EnvAct_INV4 | Investigation | Investigate the cause of the spills Storm Overflows investigation at WHEATHAMPSTEAD SPS | Due 2027-28 | Lee (from Luton Hoo Lakes to Hertford) |
| 08TW101108 · cs | EnvAct_INV4 | Investigation | Investigate the cause of the spills Storm Overflows investigation at WHITWELL STW | Due 2027-28 | Mimram (Whitwell to Codicote Bottom) |
| 08TW101108 · ct | EnvAct_INV4 | Investigation | Investigate the cause of the spills Storm Overflows investigation at WIDFORD AND WARESIDE STW | Due 2027-28 | Ash (from confluence with Bury Green Brook to Lee) |
| 08TW101457 · a | WFD_INV_PHYSHAB | Investigation | Complete fish pass options feasibility including barrier removal as the initial preferred option at Swan and Pike Weir, if removal is possible complete removal in AMP 8 otherwise construct in AMP 9 Swan and Pike Weir | Due 2027-28 | Lea Navigation (Fieldes Weir to Enfield Lock) |
| 08TW101455 · a | WFD_INV_PHYSHAB | Investigation | Complete fish pass options feasibility and take forward the preferred option to fish pass design resulting in approval from EA National Fish Pass Panel at Ware Lock for fish pass construction in AMP 9 Ware Lock | Due 2027-28 | Lee Navigation (Hertford to Fieldes Weir) |
| 08TW101108 · to | EnvAct_INV4 | Investigation | Storm Overflows investigation WESTON (HERTS) WWTW- Storm Overflows investigation | Due 2027-28 | Beane (Source to Stevenage Brook) |
| 08TW100185 · a | WFD_INV | Investigation | Investigate the cause of the spills WFD Investigation of in river Dissolved Oxygen to inform future action | Due 2027-28 | Fiddlers Brook |
| 08TW100019 · a | WFD_IMP_WRHMWB | Improvement | Implement a solution to make the impeding structure passable/easable to fish Flanders Weir Fish Pass | Due 2029-30 | Lea Navigation Enfield Lock to Tottenham Locks |
| 08TW100018 · a | WFD_IMP_WRHMWB | Improvement | Implement a solution to make the impeding structure passable/easable to fish Keids Weir Fish Pass | Due 2029-30 | Lea Navigation Enfield Lock to Tottenham Locks |
| 09TW100035 · a | EnvAct_IMP1 | Improvement | 0.25 mg/l Phosphorus permit at Mill Green STW also known as Hatfield (Mill Green) STW Reduce Phosphorus Loadings at Mill Green STW | Due 2029-30 | Lee (from Luton Hoo Lakes to Hertford) |
| 09TW100046 · a | EnvAct_IMP1 | Improvement | 0.25 mg/l Phosphorus permit at Rye Meads STW Reduce Phosphorus Loadings at Rye Meads STW | Due 2029-30 | Lea Navigation (Fieldes Weir to Enfield Lock) |
| 08TW100947 · a | EnvAct_IMP1 | Improvement | 0.25 mg/l Phosphorus permit at White Waltham STW Reduce Phosphorus Loadings at White Waltham STW | Due 2029-30 | Ash (from confluence with Bury Green Brook to Lee) |
| 08TW100948 · a | EnvAct_IMP1 | Improvement | 0.4 mg/l Phosphorus permit at Widford STW Reduce Phosphorus Loadings at Widford STW | Due 2029-30 | Ash (from confluence with Bury Green Brook to Lee) |
| 09TW100013 · a | WFD_IMP_WRHMWB | Improvement | Implement a river restorations schmeme to promote natural morphological processes River Lee (Amwell Magna Loop)River Restoration Scheme | Due 2029-30 | Lee Navigation (Hertford to Fieldes Weir) |
| 08TW101059 · a | ENVAct_IMP2 | Improvement | Default scheme: Investigation and Solution in AMP 8: 1,285m3 storage, 20m3 screen Storm Overflows action at AUCKLAND ROAD STORM TANKS SPS | Due 2029-30 | Lee (Tottenham Locks to Bow Locks/Three Mills Locks) |
| 11TW100011 · a | ENVAct_IMP2 | Improvement | Option C1: Investigation and Solution in AMP 8: 389m of sewer relining, 0.16Ha SUDS IA Removal, 20m3 screen Storm Overflows action at BARKWAY STW | Due 2029-30 | Quin |
| 08TW101050 · a | ENVAct_IMP2 | Improvement | Default scheme: Investigation and Solution in AMP 8: 1,285m3 storage, 20m3 screen Storm Overflows action at BEECH HALL CRESCENT, WALTHAMSTOW CSO | Due 2029-30 | Ching Brook |
| 08TW100987 · a | ENVAct_IMP2 | Improvement | Option C1: Investigation and Solution in AMP 8: 259m of sewer relining, 0.11Ha SUDS IA Removal, No screen required Storm Overflows action at BRICKENDON STW | Due 2029-30 | Lee (from Luton Hoo Lakes to Hertford) |
| 08TW101091 · a | ENVAct_IMP2 | Improvement | Default scheme: Investigation and Solution in AMP 8: 1,285m3 storage, 20m3 screen Storm Overflows action at HADHAM MILL SPS | Due 2029-30 | Ash (from confluence with Bury Green Brook to Lee) |
| 08TW101024 · a | ENVAct_IMP2 | Improvement | Option C1: Investigation and Solution in AMP 8: 1,737m of sewer relining, 37m3 storage, 0.71Ha SUDS IA Removal, No screen required Storm Overflows action at LITTLE HALLINGBURY STW | Due 2029-30 | Little Hallingbury Brook |
| 08TW101056 · a | ENVAct_IMP2 | Improvement | Default scheme: Investigation and Solution in AMP 8: 1,285m3 storage, 20m3 screen Storm Overflows action at MULBERRY COURT, HALL ROAD CSO | Due 2029-30 | Lee (Tottenham Locks to Bow Locks/Three Mills Locks) |
| 08TW101037 · a | ENVAct_IMP2 | Improvement | Option C1: Investigation and Solution in AMP 8: 1,685m of sewer relining, 1,006m3 storage, 0.69Ha SUDS IA Removal, 20m3 screen Storm Overflows action at TAKELEY STW | Due 2029-30 | Pincey Brook |
| 08TW101038 · a | ENVAct_IMP2 | Improvement | Option C1: Investigation and Solution in AMP 8: 1,296m of sewer relining, 633m3 storage, 0.53Ha SUDS IA Removal, 20m3 screen Storm Overflows action at THERFIELD STW | Due 2029-30 | Rib (upper stretches, above confluence with the Quin) |
| 08TW101044 · a | EnvAct_IMP2 | Improvement | Option C1: Solution in AMP 08: 752m of sewer relining, 63m3 storage, 0.31Ha SUDS IA Removal, No screen required Storm Overflows action at Weston (Herts) STW | Due 2029-30 | Beane (Source to Stevenage Brook) |
| 08TW101046 · a | ENVAct_IMP2 | Improvement | Option C1: Investigation and Solution in AMP 8: 648m of sewer relining, 220m3 storage, 0.26Ha SUDS IA Removal, No screen required Storm Overflows action at WHITWELL STW | Due 2029-30 | Mimram (Whitwell to Codicote Bottom) |
| 08TW101047 · a | ENVAct_IMP2 | Improvement | Option C1: Investigation and Solution in AMP 8: 1,439m3 storage, 20m3 screen Storm Overflows action at Widford and wareside STW | Due 2029-30 | Ash (from confluence with Bury Green Brook to Lee) |
116 of 116 measures shown. A measure whose completion date has passed is shown as Complete; the water company's actual delivery against it is reported to the regulator but not published here.
There is no public change log
The live WINEP spreadsheet is internal, and there is no versioned public comparison or published reasons when a measure is re-dated or dropped. The only way to hold slippage to account is to archive every annual release and diff it yourself.
The 2027 pressure point
Most investigations must complete by 30 April 2027 to feed the 2030–35 programme. That date — not 2030 — is the one to hold: an investigation that slips past it cannot shape the next round of funded schemes.