← St Andrews Road, Black Horse Lane

Spill evidence · River Hub

St Andrews Road, Black Horse Lane

Combined sewer overflow · TWL00383 · feeds LONDON (Becton STW)
Wet weather

The discharge

Spill day
Sunday, 19 October 2025
Started
19 Oct 2025, 08:00
Ended
20 Oct 2025, 06:00
Duration
22 hours
Receiving water
Lee (Tottenham Locks to Bow Locks/Three Mills Locks)
Parish
—

Rainfall evidence

Daily rainfall at the matched gauge (Chalk Bridge Sluice) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
19/10/2025 (spill day)13.8 mmrain
18/10/20250 mmdry
17/10/20250 mmdry
16/10/20250 mmdry
15/10/20250 mmdry

River flow that day: 3.02 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 1.3 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
Unknown (no works overflow data)
EA annual return (2025)
6 counted spills · 114 h total
Monitor uptime (2025)
99% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet TWL00383). Rainfall: EA Hydrology gauge 65f89cf9-1a2a-47f4-ab0a-f183294a2b30. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Lea Data.