← Lytton Road

Spill evidence · River Hub

Lytton Road

Combined sewer overflow · TWL00286 · feeds LONDON (Deepham STW)
Wet weather

The discharge

Spill day
Saturday, 19 July 2025
Started
19 Jul 2025, 08:30
Ended
19 Jul 2025, 13:30
Duration
5 hours
Receiving water
Pymmes Brook upstream Salmon Brook confluence
Parish
—

Rainfall evidence

Daily rainfall at the matched gauge (North Mymms) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
19/07/2025 (spill day)20.8 mmrain
18/07/202518 mmrain
17/07/20250.2 mmdry
16/07/20250 mmdry
15/07/20251 mmrain

River flow that day: 0.914 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 7.9 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
Yes — the treatment works' own overflow stayed shut that day, so capacity was available. Avoidable.
EA annual return (2025)
4 counted spills · 15 h total
Monitor uptime (2025)
100% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet TWL00286). Rainfall: EA Hydrology gauge 5b6746aa-c76a-4ea2-8903-5aa5bb759035. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Lea Data.
Spill evidence — Lytton Road — River Lea Data