← Mulberry Court, Hall Road

Spill evidence · River Hub

Mulberry Court, Hall Road

Combined sewer overflow · TWL00307 · feeds LONDON (Becton STW)
Wet weather

The discharge

Spill day
Thursday, 15 January 2026
Started
15 Jan 2026, 14:30
Ended
15 Jan 2026, 17:00
Duration
2 hours 30 minutes
Receiving water
Lee (Tottenham Locks to Bow Locks/Three Mills Locks)
Parish
—

Rainfall evidence

Daily rainfall at the matched gauge (Chalk Bridge Sluice) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
15/01/2026 (spill day)12 mmrain
14/01/20260.8 mmrain
13/01/202610 mmrain
12/01/20260.6 mmrain
11/01/20263.2 mmrain

River flow that day: 10.554 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 6.3 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
Unknown (no works overflow data)
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet TWL00307). Rainfall: EA Hydrology gauge 65f89cf9-1a2a-47f4-ab0a-f183294a2b30. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Lea Data.