← Mulberry Court, Hall Road

Spill evidence · River Hub

Mulberry Court, Hall Road

Combined sewer overflow · TWL00307 · feeds LONDON (Becton STW)
Wet weather

The discharge

Spill day
Saturday, 1 November 2025
Started
1 Nov 2025, 03:15
Ended
1 Nov 2025, 04:15
Duration
1 hour
Receiving water
Lee (Tottenham Locks to Bow Locks/Three Mills Locks)
Parish
—

Rainfall evidence

Daily rainfall at the matched gauge (Chalk Bridge Sluice) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
01/11/2025 (spill day)2.8 mmrain
31/10/202511.6 mmrain
30/10/20250 mmdry
29/10/20255.4 mmrain
28/10/20250 mmdry

River flow that day: 3.878 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 6.3 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
Unknown (no works overflow data)
EA annual return (2025)
41 counted spills · 68 h total
Monitor uptime (2025)
100% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet TWL00307). Rainfall: EA Hydrology gauge 65f89cf9-1a2a-47f4-ab0a-f183294a2b30. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Lea Data.