← Mulberry Court, Hall Road

Spill evidence · River Hub

Mulberry Court, Hall Road

Combined sewer overflow · TWL00307 · feeds LONDON (Becton STW)
Wet weather

The discharge

Spill day
Sunday, 10 March 2024
Started
10 Mar 2024, 11:30
Ended
10 Mar 2024, 12:30
Duration
1 hour
Receiving water
Lee (Tottenham Locks to Bow Locks/Three Mills Locks)
Parish
—

Rainfall evidence

Daily rainfall at the matched gauge (Chalk Bridge Sluice) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
10/03/2024 (spill day)6.2 mmrain
09/03/20241.8 mmrain
08/03/20240 mmdry
07/03/20240 mmdry
06/03/20240 mmdry

River flow that day: 18.989 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 6.3 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
Unknown (no works overflow data)
EA annual return (2024)
56 counted spills · 123 h total
Monitor uptime (2024)
99% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet TWL00307). Rainfall: EA Hydrology gauge 65f89cf9-1a2a-47f4-ab0a-f183294a2b30. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Lea Data.