← Mulberry Court, Hall Road

Spill evidence · River Hub

Mulberry Court, Hall Road

Combined sewer overflow · TWL00307 · feeds LONDON (Becton STW)
Wet weather

The discharge

Spill day
Wednesday, 3 September 2025
Started
3 Sept 2025, 02:45
Ended
3 Sept 2025, 04:45
Duration
2 hours
Receiving water
Lee (Tottenham Locks to Bow Locks/Three Mills Locks)
Parish
—

Rainfall evidence

Daily rainfall at the matched gauge (Chalk Bridge Sluice) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
03/09/2025 (spill day)7.2 mmrain
02/09/20258 mmrain
01/09/20254.8 mmrain
31/08/20250 mmdry
30/08/20251 mmrain

River flow that day: 2.6 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 6.3 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
Unknown (no works overflow data)
EA annual return (2025)
41 counted spills · 68 h total
Monitor uptime (2025)
100% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet TWL00307). Rainfall: EA Hydrology gauge 65f89cf9-1a2a-47f4-ab0a-f183294a2b30. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Lea Data.