← Takeley STW

Spill evidence · River Hub

Takeley STW

Storm overflow at the works · TWL00404 · feeds TAKELEY STW
Dry spill

Evidence strength

Medium confidence
  • ✓ Sustained discharge (≥1 h)
  • ✓ Dry on the EA 1-day window
  • ✓ Monitor 100% operational that year

The discharge

Spill day
Friday, 24 May 2024
Started
24 May 2024, 06:00
Ended
24 May 2024, 09:45
Duration
3 hours 45 minutes
Receiving water
Pincey Brook
Parish
Hatfield Broad Oak

Rainfall evidence

Daily rainfall at the matched gauge (Spellbrook) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Dry spill3-day window: Wet weather4-day window: Wet weather
DateRainfall
24/05/2024 (spill day)0 mmdry
23/05/20240 mmdry
22/05/20243 mmrain
21/05/202421.4 mmrain
20/05/20240 mmdry

River flow that day: 3.897 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 6.7 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
EA annual return (2024)
100 counted spills · 1358 h total
Monitor uptime (2024)
100% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet TWL00404). Rainfall: EA Hydrology gauge 20009a47-099f-43a3-9849-51dad7c11afe. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Lea Data.