← Deadmans Bridge
Spill evidence · River Hub
Deadmans Bridge
Combined sewer overflow · TWL00546 · feeds LONDON (Deepham STW)
Dry spill
Evidence strength
High confidence- ✓ Sustained discharge (≥1 h)
- ✓ Dry across a 4-day antecedent window
- ✓ Rain gauge close (≤5 km)
- ✓ Monitor 97% operational that year
The discharge
- Spill day
- Sunday, 24 November 2024
- Started
- 24 Nov 2024, 22:00
- Ended
- 24 Nov 2024, 23:38
- Duration
- 1 hour 38 minutes
- Receiving water
- Pymmes Brook upstream Salmon Brook confluence
- Parish
- —
Rainfall evidence
Daily rainfall at the matched gauge (Chalk Bridge Sluice) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.
1-day window: Dry spill3-day window: Dry spill4-day window: Dry spill
| Date | Rainfall | |
|---|---|---|
| 24/11/2024 (spill day) | 0 mm | dry |
| 23/11/2024 | 0 mm | dry |
| 22/11/2024 | 0 mm | dry |
| 21/11/2024 | 0 mm | dry |
| 20/11/2024 | 0 mm | dry |
River flow that day: 97.768 m³/s. Verify at the EA rainfall station.
Gauge proximity
Outlet (red) vs matched rain gauge (blue), 4.8 km apart. Closer means the rainfall reading is more representative of the overflow.
Loading map…
Severity & context
- Bathing water
- Not Applicable
- Shellfish water
- Not Applicable
- Ahead of the works
- Yes — the treatment works' own overflow stayed shut that day, so capacity was available. Avoidable.
- EA annual return (2024)
- 35 counted spills · 93 h total
- Monitor uptime (2024)
- 97% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet TWL00546). Rainfall: EA Hydrology gauge 65f89cf9-1a2a-47f4-ab0a-f183294a2b30. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Lea Data.