← Deadmans Bridge

Spill evidence · River Hub

Deadmans Bridge

Combined sewer overflow · TWL00546 · feeds LONDON (Deepham STW)
Wet weather

The discharge

Spill day
Thursday, 11 September 2025
Started
11 Sept 2025, 15:44
Ended
11 Sept 2025, 16:22
Duration
38 minutes
Receiving water
Pymmes Brook upstream Salmon Brook confluence
Parish
—

Rainfall evidence

Daily rainfall at the matched gauge (Chalk Bridge Sluice) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
11/09/2025 (spill day)4.2 mmrain
10/09/20253.2 mmrain
09/09/20250 mmdry
08/09/20250 mmdry
07/09/20250 mmdry

River flow that day: 1.716 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 4.8 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
Yes — the treatment works' own overflow stayed shut that day, so capacity was available. Avoidable.
EA annual return (2025)
21 counted spills · 37 h total
Monitor uptime (2025)
100% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet TWL00546). Rainfall: EA Hydrology gauge 65f89cf9-1a2a-47f4-ab0a-f183294a2b30. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Lea Data.
Spill evidence — Deadmans Bridge — River Lea Data