Who is fixing it

What the regulator requires

A measure is a specific action the regulator requires the water company to take at a named site — to investigate a problem, keep monitoring it, or physically fix it — each with a completion date. These are the legally binding measures on record for this catchment: what each requires, and what to watch.

These measures are legally binding. Each one is a dated, site-specific requirement the company must deliver.

The Water Industry National Environment Programme is how the Environment Agency turns statutory duties into named obligations at named sites, with a completion date attached. Where a measure requires a physical upgrade, the Agency writes the result into the site's environmental permit — and from that point the requirement is criminally enforceable.

The measure itself is public. What is not published is the water company's action to comply with it — its delivery is reported to the regulator and scored, but the underlying work, and whether a measure has actually resolved the problem on the ground, is not on the public record. What to watch is slippage: a measure can be re-dated or re-scoped, and until the permit is varied the obligation has not changed.

What the types mean

Improvement

A physical upgrade — bigger storage, better treatment, more capacity. This is the only type that actually fixes the problem on the ground.

Investigation

A study of the cause. It produces a report, not a repair — an investigation must lead to an improvement before anything changes.

Monitoring

Installing or running instruments to measure the problem. Necessary evidence, but on its own it fixes nothing — it too has to be followed by an improvement.

So an overflow whose only measures are investigations or monitoring is being looked at, not yet fixed. On the gaps page, only a measure that is still active counts as action — a measure completed while the overflow is still failing does not.

36
Measures in this catchment
WINEP, current record
36
Still active
not yet past their date
0
Assumed complete
completion date has passed
7
Are physical improvements
the rest investigate or monitor
ReferenceDriverTypeWhat it requiresStatusAttached to
08SO102553 · aU_MON4Monitoring
U_MON4b - Move AMP7 U_INV2 driver output to 2-minute flow monitoring
BRIGHSTONE WTW
Due 2026-27BRIGHSTONE
08SO102698 · aU_MON3Monitoring
U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor
BRIGHSTONE WWTW
Due 2026-27Brighstone Streams
08SO102554 · aU_MON4Monitoring
U_MON4b - Move AMP7 U_INV2 driver output to 2-minute flow monitoring
CALBOURNE WTW
Due 2026-27CALBOURNE
08SO102708 · aU_MON3Monitoring
U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor
CALBOURNE WWTW
Due 2026-27Caul Bourne
08SO102555 · aU_MON4Monitoring
U_MON4c - PR24 U_MON4 from U_INV2 investigation including civils
CHALE WTW
Due 2026-27CHALE
08SO102712 · aU_MON3Monitoring
U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor
CHALE WWTW
Due 2026-27Medina
08SO102561 · aU_MON4Monitoring
U_MON4b - Move AMP7 U_INV2 driver output to 2-minute flow monitoring
GODSHILL WTW
Due 2026-27GODSHILL
08SO102759 · aU_MON3Monitoring
U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor
GODSHILL WWTW
Due 2026-27Eastern Yar (Upper)
08SO102814 · aU_MON3Monitoring
U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor
MILL LANE SHALFLEET WPS
Due 2026-27Caul Bourne
08SO102825 · aU_MON3Monitoring
U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor
NEWBRIDGE ROAD NEWBRIDGE WPS
Due 2026-27Caul Bourne
08SO102578 · aU_MON4Monitoring
U_MON4b - Move AMP7 U_INV2 driver output to 2-minute flow monitoring
ROUD WTW
Due 2026-27ROUD
08SO102861 · aU_MON3Monitoring
U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor
ROUD WWTW
Due 2026-27Eastern Yar (Upper)
08SO102584 · aU_MON4Monitoring
U_MON4b - Move AMP7 U_INV2 driver output to 2-minute flow monitoring
SHORWELL WTW
Due 2026-27SHORWELL
08SO102872 · aU_MON3Monitoring
U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor
SHORWELL WWTW
Due 2026-27Brighstone Streams
08SO102586 · aU_MON4Monitoring
U_MON4c - PR24 U_MON4 from U_INV2 investigation including civils
ST HELENS WTW
Due 2026-27ST HELENS
08SO102885 · aU_MON3Monitoring
U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor
ST HELENS WWTW
Due 2026-27Eastern Yar (Lower)
08SO102594 · aU_MON4Monitoring
U_MON4c - PR24 U_MON4 from U_INV2 investigation including civils
WROXALL WTW
Due 2026-27Wroxall Stream
08SO102935 · aU_MON3Monitoring
U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor
WROXALL WWTW
Due 2026-27Wroxall Stream
08SO104802 · aWFD_INVInvestigation
Investigations for actions to improve water quality in terms of relevant WFD status objectives.
BRIGHSTONE WTW
Due 2027-28BRIGHSTONE
08SO100043 · hEnvAct_INV4Investigation
Investigation to determine the target number of spills from the storm overflow to protect the environment and demonstrate no local adverse ecological impact
BROOKSIDE DAIRY WROXALL CSO
Due 2027-28WROXALL STREAM
08SO104950 · pzEnvAct_INV4Investigation
Investigation to determine the target number of spills from the storm overflow to protect the environment and demonstrate no local adverse ecological impact
CALBOURNE SSO
Due 2027-28Caul Bourne
08SO104803 · aWFD_INVInvestigation
Investigations for actions to improve water quality in terms of relevant WFD status objectives.
CHILLERTON WTW
Due 2027-28Medina
08SO104950 · nzEnvAct_INV4Investigation
Investigation to determine the target number of spills from the storm overflow to protect the Shellfish Water and ensure no more than 10 spills per annum (on average) as an agglomeration
MILL LANE SHALFLEET CEO
Due 2027-28Caul Bourne
08SO100043 · bxEnvAct_INV4Investigation
Investigation to determine the target number of spills from the storm overflow to protect the environment and demonstrate no local adverse ecological impact
PARK ROAD RYDE CSO
Due 2027-28MONKTONMEAD BROOK
08SO104950 · qrEnvAct_INV4Investigation
Investigation to determine the target number of spills from the storm overflow to protect the environment and demonstrate no local adverse ecological impact
PRICHETTS WAY ROOKLEY CEO
Due 2027-28Medina
08SO104950 · pcEnvAct_INV4Investigation
Investigation to determine the target number of spills from the storm overflow to protect the environment and demonstrate no local adverse ecological impact
ROUD SSO
Due 2027-28Eastern Yar (Upper)
08SO104950 · ogEnvAct_INV4Investigation
Investigation to determine the target number of spills from the storm overflow to protect the Shellfish Water and ensure no more than 10 spills per annum (on average) as an agglomeration
SIMEON STREET RYDE CSO
Due 2027-28Monktonmead Brook
08SO104950 · tEnvAct_INV4Investigation
Investigation to determine the target number of spills from the storm overflow to protect the environment and demonstrate no local adverse ecological impact
ST HELENS SSO
Due 2027-28Eastern Yar (Lower)
08SO104950 · drEnvAct_INV4Investigation
Investigation to determine the target number of spills from the storm overflow to protect the environment and demonstrate no local adverse ecological impact
WROXALL CEO
Due 2027-28WROXALL STREAM
08SO100091 · aEnvAct_IMP2Improvement
Screen Only (IMP5)
BROOKSIDE DAIRY WROXALL CSO
Due 2029-30WROXALL STREAM
08SO103938 · aEnvAct_IMP2Improvement
Wetland + Lining
CALBOURNE SSO
Due 2029-30Caul Bourne
08SO104001 · aHD_IMP_NNImprovement
Amend permit limit of Total N to 10 mg/l
WROXALL
Due 2029-30Wroxall Stream
08SO100216 · aEnvAct_IMP2Improvement
SuDS + Storage
WROXALL CEO
Due 2029-30WROXALL STREAM
08SO103235 · aEnvAct_IMP2Improvement
SuDS and Storage are the preferred option, but costs based on storage only
MILL LANE SHALFLEET CEO
Due 2034-35Caul Bourne
08SO103260 · aEnvAct_IMP2Improvement
SuDS + Storage
SIMEON STREET RYDE CSO
Due 2034-35Monktonmead Brook
08SO103962 · aEnvAct_IMP2Improvement
Wetland + Lining
ST HELENS SSO
Due 2034-35Eastern Yar (Lower)

36 of 36 measures shown. A measure whose completion date has passed is shown as Complete; the water company's actual delivery against it is reported to the regulator but not published here.

There is no public change log

The live WINEP spreadsheet is internal, and there is no versioned public comparison or published reasons when a measure is re-dated or dropped. The only way to hold slippage to account is to archive every annual release and diff it yourself.

The 2027 pressure point

Most investigations must complete by 30 April 2027 to feed the 2030–35 programme. That date — not 2030 — is the one to hold: an investigation that slips past it cannot shape the next round of funded schemes.