What the regulator requires
A measure is a specific action the regulator requires the water company to take at a named site — to investigate a problem, keep monitoring it, or physically fix it — each with a completion date. These are the legally binding measures on record for this catchment: what each requires, and what to watch.
These measures are legally binding. Each one is a dated, site-specific requirement the company must deliver.
The Water Industry National Environment Programme is how the Environment Agency turns statutory duties into named obligations at named sites, with a completion date attached. Where a measure requires a physical upgrade, the Agency writes the result into the site's environmental permit — and from that point the requirement is criminally enforceable.
The measure itself is public. What is not published is the water company's action to comply with it — its delivery is reported to the regulator and scored, but the underlying work, and whether a measure has actually resolved the problem on the ground, is not on the public record. What to watch is slippage: a measure can be re-dated or re-scoped, and until the permit is varied the obligation has not changed.
What the types mean
A physical upgrade — bigger storage, better treatment, more capacity. This is the only type that actually fixes the problem on the ground.
A study of the cause. It produces a report, not a repair — an investigation must lead to an improvement before anything changes.
Installing or running instruments to measure the problem. Necessary evidence, but on its own it fixes nothing — it too has to be followed by an improvement.
So an overflow whose only measures are investigations or monitoring is being looked at, not yet fixed. On the gaps page, only a measure that is still active counts as action — a measure completed while the overflow is still failing does not.
| Reference | Driver | Type | What it requires | Status | Attached to |
|---|---|---|---|---|---|
| 08TW100532 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) Hogsmill wwtw | Complete 2025-26 | Hogsmill |
| 08TW101462 · a | EDWRMP_INV | Investigation | Working in conjunction with SES Water (ref 08SU100011) to assess the suggested abstraction reductions in Hogsmill Catchment included in the WRMP, in terms of volume, timing and optimisation of benefit Hogsmill Environmental Destination Investigation | Due 2026-27 | Hogsmill |
| 08TW100347 · a | U_MON4 | Monitoring | Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a) Hogsmill wwtw | Due 2026-27 | Hogsmill |
| 08TW100124 · a | WFD_NDLS_Chem2 | No deterioration | Hogsmill STW, Nonylphenol, 0.5 ug Reduce Nonylphenol loading | Due 2026-27 | Hogsmill |
| 08TW101108 · ja | EnvAct_INV4 | Investigation | Investigate the cause of the spills Storm Overflows investigation at BRIDLE CLOSE, EWELL UNPERMITTED CSO | Due 2027-28 | Hogsmill |
| 08TW101108 · ei | EnvAct_INV4 | Investigation | Investigate the cause of the spills Storm Overflows investigation at EPSOM STORM TANKS, LONGMEAD ROAD CSO | Due 2027-28 | Hogsmill |
| 08TW101108 · ee | EnvAct_INV4 | Investigation | Investigate the cause of the spills Storm Overflows investigation at HOGSMILL STW | Due 2027-28 | Hogsmill |
| 08TW101108 · eh | EnvAct_INV4 | Investigation | Investigate the cause of the spills Storm Overflows investigation at MANOR DRIVE STORMWATER TANKS CSO | Due 2027-28 | Hogsmill |
| 08TW101108 · ej | EnvAct_INV4 | Investigation | Investigate the cause of the spills Storm Overflows investigation at ST JAMES'S ROAD CSO | Due 2027-28 | Hogsmill |
| 08TW101108 · mm | EnvAct_INV4 | Investigation | Investigate the cause of the spills Storm Overflows investigation at TONSTALL ROAD UNPERMITTED CSO | Due 2027-28 | Hogsmill |
| 08TW100033 · a | WFD_ND_WRFlow | No deterioration | Implement a river restorations schmeme to promote natural morphological processes Hogsmill River Restoration Scheme | Due 2029-30 | Hogsmill |
| 08TW100910 · a | EnvAct_IMP1 | Improvement | 0.25 mg/l Phosphorus permit with stretch target of 0.2 mg/l at Hogsmill STW Reduce Phosphorus Loadings at Hogsmill STW | Due 2029-30 | Hogsmill |
12 of 12 measures shown. A measure whose completion date has passed is shown as Complete; the water company's actual delivery against it is reported to the regulator but not published here.
There is no public change log
The live WINEP spreadsheet is internal, and there is no versioned public comparison or published reasons when a measure is re-dated or dropped. The only way to hold slippage to account is to archive every annual release and diff it yourself.
The 2027 pressure point
Most investigations must complete by 30 April 2027 to feed the 2030–35 programme. That date — not 2030 — is the one to hold: an investigation that slips past it cannot shape the next round of funded schemes.