Who is fixing it

Reduction tracker

Is each overflow actually spilling less? The reduction plan won't tell you per overflow — so we measure it from the spill record.

What the plan is, and what it leaves out

The Storm Overflows Discharge Reduction Plan is the government's plan — published in 2022 and expanded in September 2023 — to cut how often England's storm overflows discharge. It sets deadlines by category, not by overflow:

  • By 2035 — overflows near every designated bathing water, and 75% of those near high-priority nature sites, must be improved.
  • By 2045 — the remaining high-priority overflows.
  • By 2050 — every storm overflow, with discharges capped at around 10 spills a year regardless of location.

The targets are due to be reviewed in 2027 — a commitment in the plan, not a statutory duty. But the plan sets no target for any individual overflow and publishes no per-overflow progress — only these whole-category deadlines, and it doesn't even publish which specific overflows are high-priority. So there is no official way to ask “is this overflow on track?” This page builds that view from the Environment Agency's EDM record: each overflow's counted spills per year — the EA's own 12/24-hour block figure, the same basis the cap is written in — against its 2020 baseline and the 2050 cap of ~10, with the deadline its location implies.

11
Above the 2050 cap
of 15 tracked
8
Rising since baseline
trend is the wrong way
0
On a 2035 deadline
near a bathing water
4
Within the cap
≤10 spills in 2025

Every overflow against its cap

Ranked by the latest full year's spills. The deadline is derived from proximity to a designated site — indicative, not an official per-overflow target. The dotted line on each trajectory is the 10-spills cap.

OverflowDeadlineBaselineLatestSince baselinevs capTrajectoryVerdict
Praze An Beeble STWSSO
SBB00980
2050177 ·24
147
50 events
-17%14.7×Falling — behind
Goonhavern STWSSO
SBB00500
2050115
115
57 events
0%11.5×Falling — behind
Goonhavern STWSO
SBB00499
205073
84
75 events
+15%8.4×Rising
Relistian pumping stationPS-CSO/EO
SBB01021
205041
76
102 events
+85%7.6×Rising
Troon 1&2CSO
SBB01286
205084 ·24
71
79 events
-15%7.1×Falling — behind
Tolvaddon Tank, RedruthCSO
SBB01249
205033
69
73 events
+109%6.9×Rising
Penponds pumping station, CambornePS-CSO/EO
SBB00779
205052 ·24
62
64 events
+19%6.2×Rising
Reskadinnick pumping station, CambornePS-CSO/EO
SBB01023
205038
42
51 events
+11%4.2×Rising
Knave-go-by, CamborneCSO
SBB00649
20508
40
50 events
+400%4×Rising
St Martins Crescent, CamborneCSO
SBB01147
205015
19
10 events
+27%1.9×Rising
Sunnyside Tank, RedruthCSO
SBB01195
20508
12
3 events
+50%1.2×Rising
Copper Terrace, HayleCSO
SBB01400
20504 ·25
4
6 events
0%0.4×—Within the cap
Chapel Hill, CamborneCSO
SBB01421
20501 ·24
2
0 events
+100%0.2×Within the cap
Station Road pumping station, PerranporthPS-CSO/EO
SBB01165
20506
1
1 events
-83%0.1×Within the cap
Praze An Beeble STWSO
SBB00979
20504 ·24
0
0 events
-100%0×—Within the cap

What this is — and what it is not

This is River Hub's measurement, not the plan's. The reduction plan publishes no target for an individual overflow and no per-overflow progress — so we compare each outlet's counted spills to its 2020 baseline and the 10/year cap. Counted spills use the Environment Agency's 12/24-hour block method — the figure the cap is actually written in — taken from the published annual return where we have it and computed the same way for the current year; the smaller “events” figure beneath each is River Hub's count of discrete discharges over 15 minutes, shown for context. The deadline shown is derived by proximity to a designated site, not an official determination, and the plan is a policy commitment rather than a statutory duty. A falling trend is progress, but only ≤10 by the deadline is compliance. Where 2020 data is thin the baseline falls back to the earliest year on record, shown beside it. How the two counts differ →