← Parkmill Overflow

Spill evidence · River Hub

Parkmill Overflow

Pumping station overflow · DCWW2318 · feeds SOUTHGATE (HAEL LANE)
Wet weather

The discharge

Spill day
Saturday, 24 October 2026
Started
24 Oct 2026, 21:15
Ended
24 Oct 2026, 21:45
Duration
29 minutes 38 seconds
Receiving water
Pennard Pill
Community
Ilston

Rainfall evidence

Daily rainfall at the matched gauge (Southgate Raingauge) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
24/10/2026 (spill day)21.2 mmrain
23/10/20266.8 mmrain
22/10/202614.2 mmrain
21/10/202618.4 mmrain
20/10/20260 mmdry

River flow that day: 10.378 m³/s.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 2.0 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not a bathing-water overflow
Shellfish water
Not a shellfish-water overflow
Ahead of the works
Unknown (no works overflow data)
Method & provenance. Dry/wet classification is decided by rainfall at the nearest NRW gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Dŵr Cymru Welsh Water live storm overflow feed, read hourly by River Hub (outlet DCWW2318). Rainfall: NRW telemetry gauge H059497307. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by Nentydd Gŵyr / Gower streams Data.