Why it keeps happening

Before the works

An overflow that spills while its own treatment works stays shut is not being overwhelmed by rain — the problem is upstream of the works, and local.

If the sewer network were genuinely overwhelmed by rainfall, the treatment works' own storm overflow would be discharging too.

When an upstream overflow spills on a day its works did not, the works still had capacity — so the discharge points to a blockage, a failed pump, or infiltration on that branch, not to a works too small for its catchment. That changes who pays and how fast: a branch fault is maintenance, chargeable now, not a capital scheme waiting for the next five-year price review.

OverflowEventsIts worksOn record
Town Quay pumping station, FoweyPS-CSO/EO567Fowey STWMeasure linked
Lerryn pumping stationPS-CSO/EO292Lerryn STWNo measure
Coulsons Park pumping station, LostwithielPS-CSO/EO219Lostwithiel STWNo measure
Lanreath pumping stationPS-CSO149Pelynt STWNo measure
Caffa Mill pumping station, FoweyPS-CSO/EO59Fowey STWMeasure linked
St Neot pumping station, LiskeardPS-CSO/EO52St Neot STWNo measure
Golant pumping stationPS-CSO/EO17Golant STWNo measure
Readymoney Road, FoweyCSO8Fowey STWMeasure linked
Bodinnick, FoweyCSO5Fowey STWMeasure linked
Ready Money Cove pumping station, FoweyPS-CSO/EO4Fowey STWNo measure
Whitehse Slip Point, FoweyCSO2Fowey STWNo measure

What this needs to be reliable

The comparison needs both monitors working. Where a works' own overflow monitor was offline we record no result rather than a pre-works spill, so this is a floor. A treatment works itself is excluded — it is the end of the line and cannot spill before the works. Two works in the catchment have no monitored overflow at all, so their upstream overflows are listed as not assessed, not as clean.