Who is fixing it

Reduction tracker

Is each overflow actually spilling less? The reduction plan won't tell you per overflow — so we measure it from the spill record.

What the plan is, and what it leaves out

The Storm Overflows Discharge Reduction Plan is the government's plan — published in 2022 and expanded in September 2023 — to cut how often England's storm overflows discharge. It sets deadlines by category, not by overflow:

  • By 2035 — overflows near every designated bathing water, and 75% of those near high-priority nature sites, must be improved.
  • By 2045 — the remaining high-priority overflows.
  • By 2050 — every storm overflow, with discharges capped at around 10 spills a year regardless of location.

The targets are due to be reviewed in 2027 — a commitment in the plan, not a statutory duty. But the plan sets no target for any individual overflow and publishes no per-overflow progress — only these whole-category deadlines, and it doesn't even publish which specific overflows are high-priority. So there is no official way to ask “is this overflow on track?” This page builds that view from the Environment Agency's EDM record: each overflow's counted spills per year — the EA's own 12/24-hour block figure, the same basis the cap is written in — against its 2020 baseline and the 2050 cap of ~10, with the deadline its location implies.

11
Above the 2050 cap
of 16 tracked
4
Rising since baseline
trend is the wrong way
0
On a 2035 deadline
near a bathing water
5
Within the cap
≤10 spills in 2025

Every overflow against its cap

Ranked by the latest full year's spills. The deadline is derived from proximity to a designated site — indicative, not an official per-overflow target. The dotted line on each trajectory is the 10-spills cap.

OverflowDeadlineBaselineLatestSince baselinevs capTrajectoryVerdict
Town Quay pumping station, FoweyPS-CSO/EO
SBB01268
2050188
198
373 events
+5%19.8×Rising
St Neot STWSO
SBB01155
2050245 ·24
167
500 events
-32%16.7×Falling — behind
Common Moor STWSO
SBB00299
2050160 ·24
127
136 events
-21%12.7×Falling — behind
Golant pumping stationPS-CSO/EO
SBB00494
205070
93
11 events
+33%9.3×Rising
St Neot pumping station, LiskeardPS-CSO/EO
SBB00230
205081 ·24
82
42 events
+1%8.2×Rising
Coulsons Park pumping station, LostwithielPS-CSO/EO
SBB00311
2050130
78
31 events
-40%7.8×Falling — behind
Fowey STWSSO
SBB00475
2050247
72
96 events
-71%7.2×Falling — behind
Caffa Mill pumping station, FoweyPS-CSO/EO
SBB00199
2050172
38
43 events
-78%3.8×Falling — behind
Lanreath pumping stationPS-CSO
SBB00667
205097
23
17 events
-76%2.3×Falling — behind
Lerryn pumping stationPS-CSO/EO
SBB00682
205081
19
15 events
-77%1.9×Falling — behind
East Taphouse STWSO
SBB00398
205016
18
23 events
+13%1.8×Rising
Whitehse Slip Point, FoweyCSO
SBB01356
20502
7
1 events
+250%0.7×Within the cap
Bodinnick, FoweyCSO
SBB00124
20506
3
2 events
-50%0.3×Within the cap
Ready Money Cove pumping station, FoweyPS-CSO/EO
SBB01017
20503
2
2 events
-33%0.2×Within the cap
Readymoney Road, FoweyCSO
SBB01018
205012
0
0 events
-100%0×Within the cap
Polruan Quay pumping stationPS-CSO/EO
SBB00954
20504
0
0 events
-100%0×Within the cap

What this is — and what it is not

This is River Hub's measurement, not the plan's. The reduction plan publishes no target for an individual overflow and no per-overflow progress — so we compare each outlet's counted spills to its 2020 baseline and the 10/year cap. Counted spills use the Environment Agency's 12/24-hour block method — the figure the cap is actually written in — taken from the published annual return where we have it and computed the same way for the current year; the smaller “events” figure beneath each is River Hub's count of discrete discharges over 15 minutes, shown for context. The deadline shown is derived by proximity to a designated site, not an official determination, and the plan is a policy commitment rather than a statutory duty. A falling trend is progress, but only ≤10 by the deadline is compliance. Where 2020 data is thin the baseline falls back to the earliest year on record, shown beside it. How the two counts differ →