← The Mill (kingham) pumping station

Spill evidence · River Hub

The Mill (kingham) pumping station

Pumping station overflow · TWL00252 · feeds CHIPPING NORTON, WORCESTER ROAD STW"
Wet weather

The discharge

Spill day
Tuesday, 24 September 2024
Started
24 Sept 2024, 01:30
Ended
24 Sept 2024, 02:00
Duration
30 minutes
Receiving water
Cornwell Brook and tributaries (Source to Evenlode)
Parish
Kingham

Rainfall evidence

Daily rainfall at the matched gauge (Chipping Norton) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
24/09/2024 (spill day)0 mmdry
23/09/202449.24 mmrain
22/09/202477.52 mmrain
21/09/20242.17 mmrain
20/09/20241.11 mmrain

River flow that day: 1.432 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 5.0 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
Yes — the treatment works' own overflow stayed shut that day, so capacity was available. Avoidable.
EA annual return (2024)
23 counted spills · 109 h total
Monitor uptime (2024)
100% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet TWL00252). Rainfall: EA Hydrology gauge bcdb1cad-f070-49dc-9eb6-1512273b1119. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Evenlode Data.