← Primrose Court (moreton-in-marsh) pumping station
Spill evidence · River Hub
Primrose Court (moreton-in-marsh) pumping station
Pumping station overflow · TWL00726 · feeds MORETON IN MARSH, MORETON IN MA STW"
Wet weather
The discharge
- Spill day
- Thursday, 19 November 2026
- Started
- 19 Nov 2026, 20:30
- Ended
- 19 Nov 2026, 21:00
- Duration
- 30 minutes
- Receiving water
- Evenlode (Source to Four Shires S) and Longborough Stream
- Parish
- Moreton-in-Marsh
Rainfall evidence
Daily rainfall at the matched gauge (Chipping Campden) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.
1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
| Date | Rainfall | |
|---|---|---|
| 19/11/2026 (spill day) | 0.4 mm | rain |
| 18/11/2026 | 8.8 mm | rain |
| 17/11/2026 | 0.8 mm | rain |
| 16/11/2026 | 25.6 mm | rain |
| 15/11/2026 | 18 mm | rain |
River flow that day: 6.895 m³/s. Verify at the EA rainfall station.
Gauge proximity
Outlet (red) vs matched rain gauge (blue), 8.4 km apart. Closer means the rainfall reading is more representative of the overflow.
Loading map…
Severity & context
- Bathing water
- Not Applicable
- Shellfish water
- Not Applicable
- Ahead of the works
- Unknown (no works overflow data)
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet TWL00726). Rainfall: EA Hydrology gauge 65389ec8-8980-4285-9c03-dcdc11aa26ad. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Evenlode Data.