← Primrose Court (moreton-in-marsh) pumping station

Spill evidence · River Hub

Primrose Court (moreton-in-marsh) pumping station

Pumping station overflow · TWL00726 · feeds MORETON IN MARSH, MORETON IN MA STW"
Wet weather

The discharge

Spill day
Friday, 9 January 2026
Started
9 Jan 2026, 01:30
Ended
10 Jan 2026, 23:45
Duration
1 day 22 hours
Receiving water
Evenlode (Source to Four Shires S) and Longborough Stream
Parish
Moreton-in-Marsh

Rainfall evidence

Daily rainfall at the matched gauge (Chipping Campden) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
09/01/2026 (spill day)0 mmdry
08/01/202618 mmrain
07/01/20260.4 mmrain
06/01/20261.6 mmrain
05/01/20260 mmdry

River flow that day: 15.709 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 8.4 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
Unknown (no works overflow data)
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet TWL00726). Rainfall: EA Hydrology gauge 65389ec8-8980-4285-9c03-dcdc11aa26ad. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Evenlode Data.