← Primrose Court (moreton-in-marsh) pumping station

Spill evidence · River Hub

Primrose Court (moreton-in-marsh) pumping station

Pumping station overflow · TWL00726 · feeds MORETON IN MARSH, MORETON IN MA STW"
Dry spill

Evidence strength

Medium confidence
  • ✓ Sustained discharge (≥1 h)
  • ✓ Dry across a 4-day antecedent window

The discharge

Spill day
Wednesday, 4 March 2026
Started
4 Mar 2026, 07:30
Ended
4 Mar 2026, 12:15
Duration
4 hours 45 minutes
Receiving water
Evenlode (Source to Four Shires S) and Longborough Stream
Parish
Moreton-in-Marsh

Rainfall evidence

Daily rainfall at the matched gauge (Chipping Campden) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Dry spill3-day window: Dry spill4-day window: Dry spill
DateRainfall
04/03/2026 (spill day)0 mmdry
03/03/20260 mmdry
02/03/20260.2 mmdry
01/03/20260 mmdry
28/02/20260 mmdry

River flow that day: 7.634 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 8.4 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
Unknown (no works overflow data)
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet TWL00726). Rainfall: EA Hydrology gauge 65389ec8-8980-4285-9c03-dcdc11aa26ad. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Evenlode Data.