Who is fixing it

Reduction tracker

Is each overflow actually spilling less? The reduction plan won't tell you per overflow — so we measure it from the spill record.

What the plan is, and what it leaves out

The Storm Overflows Discharge Reduction Plan is the government's plan — published in 2022 and expanded in September 2023 — to cut how often England's storm overflows discharge. It sets deadlines by category, not by overflow:

  • By 2035 — overflows near every designated bathing water, and 75% of those near high-priority nature sites, must be improved.
  • By 2045 — the remaining high-priority overflows.
  • By 2050 — every storm overflow, with discharges capped at around 10 spills a year regardless of location.

The targets are due to be reviewed in 2027 — a commitment in the plan, not a statutory duty. But the plan sets no target for any individual overflow and publishes no per-overflow progress — only these whole-category deadlines, and it doesn't even publish which specific overflows are high-priority. So there is no official way to ask “is this overflow on track?” This page builds that view from the Environment Agency's EDM record: each overflow's counted spills per year — the EA's own 12/24-hour block figure, the same basis the cap is written in — against its 2020 baseline and the 2050 cap of ~10, with the deadline its location implies.

7
Above the 2050 cap
of 13 tracked
3
Rising since baseline
trend is the wrong way
0
On a 2035 deadline
near a bathing water
6
Within the cap
≤10 spills in 2025

Every overflow against its cap

Ranked by the latest full year's spills. The deadline is derived from proximity to a designated site — indicative, not an official per-overflow target. The dotted line on each trajectory is the 10-spills cap.

OverflowDeadlineBaselineLatestSince baselinevs capTrajectoryVerdict
Ivybridge STW, Ivybridge 1SSO
SBB00617
2050103
84
40 events
-18%8.4×Falling — behind
Brownston STW, Lower BrownstonSO
SBB00173
205049 ·24
59
55 events
+20%5.9×Rising
Ugborough STWSO
SBB01294
205068 ·24
54
120 events
-21%5.4×Falling — behind
Holbeton STWSSO
SBB00576
2050112
46
21 events
-59%4.6×Falling — behind
Ugborough STWSSO
SBB01295
205017 ·24
38
14 events
+124%3.8×Rising
Ivybridge STW, Ivybridge 2SSO
SBB00618
205061
37
60 events
-39%3.7×Falling — behind
Town Hill, ErmingtonCSO
SBB00911
20508
27
22 events
+238%2.7×Rising
Ermington STWSO
SBB00416
20507
9
9 events
+29%0.9×Within the cap
Bittaford STWSSO
SBB00112
20505 ·25
5
3 events
0%0.5×—Within the cap
Playing Field, ErmingtonCSO
SBB00942
20502 ·25
2
2 events
0%0.2×—Within the cap
Pavilions pumping station, IvybridgePS-CSO/EO
SBB00915
20501
0
1 events
-100%0×Within the cap
Erme Rd, IvybridgeCSO
SBB00415
20500 ·22
0
0 events
—0×—Within the cap
Station Rd, IvybridgeCSO
SBB01162
20500 ·24
0
0 events
—0×—Within the cap

What this is — and what it is not

This is River Hub's measurement, not the plan's. The reduction plan publishes no target for an individual overflow and no per-overflow progress — so we compare each outlet's counted spills to its 2020 baseline and the 10/year cap. Counted spills use the Environment Agency's 12/24-hour block method — the figure the cap is actually written in — taken from the published annual return where we have it and computed the same way for the current year; the smaller “events” figure beneath each is River Hub's count of discrete discharges over 15 minutes, shown for context. The deadline shown is derived by proximity to a designated site, not an official determination, and the plan is a policy commitment rather than a statutory duty. A falling trend is progress, but only ≤10 by the deadline is compliance. Where 2020 data is thin the baseline falls back to the earliest year on record, shown beside it. How the two counts differ →