Reduction tracker
Is each overflow actually spilling less? The reduction plan won't tell you per overflow — so we measure it from the spill record.
What the plan is, and what it leaves out
The Storm Overflows Discharge Reduction Plan is the government's plan — published in 2022 and expanded in September 2023 — to cut how often England's storm overflows discharge. It sets deadlines by category, not by overflow:
- By 2035 — overflows near every designated bathing water, and 75% of those near high-priority nature sites, must be improved.
- By 2045 — the remaining high-priority overflows.
- By 2050 — every storm overflow, with discharges capped at around 10 spills a year regardless of location.
The targets are due to be reviewed in 2027 — a commitment in the plan, not a statutory duty. But the plan sets no target for any individual overflow and publishes no per-overflow progress — only these whole-category deadlines, and it doesn't even publish which specific overflows are high-priority. So there is no official way to ask “is this overflow on track?” This page builds that view from the Environment Agency's EDM record: each overflow's counted spills per year — the EA's own 12/24-hour block figure, the same basis the cap is written in — against its 2020 baseline and the 2050 cap of ~10, with the deadline its location implies.
Every overflow against its cap
Ranked by the latest full year's spills. The deadline is derived from proximity to a designated site — indicative, not an official per-overflow target. The dotted line on each trajectory is the 10-spills cap.
| Overflow | Deadline | Baseline | Latest | Since baseline | vs cap | Trajectory | Verdict |
|---|---|---|---|---|---|---|---|
| Ivybridge STW, Ivybridge 1SSO SBB00617 | 2050 | 103 | 84 40 events | -18% | 8.4× | Falling — behind | |
| Brownston STW, Lower BrownstonSO SBB00173 | 2050 | 49 ·24 | 59 55 events | +20% | 5.9× | Rising | |
| Ugborough STWSO SBB01294 | 2050 | 68 ·24 | 54 120 events | -21% | 5.4× | Falling — behind | |
| Holbeton STWSSO SBB00576 | 2050 | 112 | 46 21 events | -59% | 4.6× | Falling — behind | |
| Ugborough STWSSO SBB01295 | 2050 | 17 ·24 | 38 14 events | +124% | 3.8× | Rising | |
| Ivybridge STW, Ivybridge 2SSO SBB00618 | 2050 | 61 | 37 60 events | -39% | 3.7× | Falling — behind | |
| Town Hill, ErmingtonCSO SBB00911 | 2050 | 8 | 27 22 events | +238% | 2.7× | Rising | |
| Ermington STWSO SBB00416 | 2050 | 7 | 9 9 events | +29% | 0.9× | Within the cap | |
| Bittaford STWSSO SBB00112 | 2050 | 5 ·25 | 5 3 events | 0% | 0.5× | — | Within the cap |
| Playing Field, ErmingtonCSO SBB00942 | 2050 | 2 ·25 | 2 2 events | 0% | 0.2× | — | Within the cap |
| Pavilions pumping station, IvybridgePS-CSO/EO SBB00915 | 2050 | 1 | 0 1 events | -100% | 0× | Within the cap | |
| Erme Rd, IvybridgeCSO SBB00415 | 2050 | 0 ·22 | 0 0 events | — | 0× | — | Within the cap |
| Station Rd, IvybridgeCSO SBB01162 | 2050 | 0 ·24 | 0 0 events | — | 0× | — | Within the cap |
What this is — and what it is not
This is River Hub's measurement, not the plan's. The reduction plan publishes no target for an individual overflow and no per-overflow progress — so we compare each outlet's counted spills to its 2020 baseline and the 10/year cap. Counted spills use the Environment Agency's 12/24-hour block method — the figure the cap is actually written in — taken from the published annual return where we have it and computed the same way for the current year; the smaller “events” figure beneath each is River Hub's count of discrete discharges over 15 minutes, shown for context. The deadline shown is derived by proximity to a designated site, not an official determination, and the plan is a policy commitment rather than a statutory duty. A falling trend is progress, but only ≤10 by the deadline is compliance. Where 2020 data is thin the baseline falls back to the earliest year on record, shown beside it. How the two counts differ →