Who is fixing it

What the regulator requires

A measure is a specific action the regulator requires the water company to take at a named site — to investigate a problem, keep monitoring it, or physically fix it — each with a completion date. These are the legally binding measures on record for this catchment: what each requires, and what to watch.

These measures are legally binding. Each one is a dated, site-specific requirement the company must deliver.

The National Environment Programme is how Natural Resources Wales turns statutory duties into named obligations at named sites, with a completion date attached. Where a measure requires a physical upgrade, NRW writes the result into the site's environmental permit — and from that point the requirement is criminally enforceable.

The measure itself is public. What is not published is the water company's action to comply with it — its delivery is reported to the regulator and scored, but the underlying work, and whether a measure has actually resolved the problem on the ground, is not on the public record. What to watch is slippage: a measure can be re-dated or re-scoped, and until the permit is varied the obligation has not changed.

What the types mean

Improvement

A physical upgrade — bigger storage, better treatment, more capacity. This is the only type that actually fixes the problem on the ground.

Investigation

A study of the cause. It produces a report, not a repair — an investigation must lead to an improvement before anything changes.

Monitoring

Installing or running instruments to measure the problem. Necessary evidence, but on its own it fixes nothing — it too has to be followed by an improvement.

So an overflow whose only measures are investigations or monitoring is being looked at, not yet fixed. On the gaps page, only a measure that is still active counts as action — a measure completed while the overflow is still failing does not.

80
Measures in this catchment
NEP, current record
73
Still active
not yet past their date
7
Assumed complete
completion date has passed
6
Are physical improvements
the rest investigate or monitor
ReferenceDriverTypeWhat it requiresStatusAttached to
DCWW100154a · 06b86d5aW_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
Cardiff ST FAGANS STW
Complete 2025-26St Fagans Storm Overflow
DCWW100171a · c8fee5f9W_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
COSLECH STW
Complete 2025-26Coslech WwTW Storm Overflow
DCWW100174a · 44412bd8W_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
CREIGIAU SEWAGE TREATMENT WORKS HOE
Complete 2025-26Creigiau WwTW Storm Overflow
DCWW100197a · 142750a8W_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
DUFFRYN ISAF SEWAGE TREATMENT WORKS
Complete 2025-26Dyffryn Isaf WwTW Storm Overflow
DCWW100338a · 22b31f95W_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
PETERSTON SUPER ELY STW CSO MAIN AV
Complete 2025-26Peterston-super-Ely WwTW Storm Overflow
DCWW100360a · f49244e1W_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
RHIWSAESON STW RHIWSAESON LLANTRI
Complete 2025-26Rhiwsaeson WwTW Storm Overflow
DCWW100093a · b6bef5e0W_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
RHYDLAFAR STW ST FAGANS CARDIFF
Complete 2025-26Rhydlafar WwTW Storm Overflow
DCWW102155a · 840a1d5bW_U_O_INV1Investigation
Investigation to classify a storm overflow in ''high priority locations'' in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
CARDIFF ELY MILL ROAD/MUSTON ROAD
Due 2026-27Mill Road 1 Storm Overflow
DCWW101599a · c45b8f6cW_WFD_PG_IMP4Improvement
Implementation of actions to achieve good status at a waterbody and / or site level due to Phosphorus relating to Reasons for Not Achieving Good (RNAGs) identified against water company assets or activities and phosphorus status of the waterbody.
WQ
COSLECH
Due 2026-27SOUTH ELY VALLEY STW
DCWW101600a · e03bd6feW_WFD_PG_IMP4Improvement
Implementation of actions to achieve good status at a waterbody and / or site level due to Phosphorus relating to Reasons for Not Achieving Good (RNAGs) identified against water company assets or activities and phosphorus status of the waterbody.
WQ
Dyffryn Isaf
Due 2026-27Water body only
DCWW102151a · 462e286cW_U_O_INV1Investigation
Investigation to classify a storm overflow in ''high priority locations'' in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
ELY RACECOURSE CSO, CARDIFF
Due 2026-27Penally Road Ely Cardiff Overflow
DCWW102188a · 23ea1be7W_U_O_INV1Investigation
Investigation to classify a storm overflow in ''high priority locations'' in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Penarth Head SPS CSO
Due 2026-27Penarth Marina Storm Overflow
DCWW102120a · e1f683daW_U_O_INV1Investigation
Investigation to classify a storm overflow in ''high priority locations'' in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
PETERSTON-SUPER-ELY STW STORM
Due 2026-27Peterston-super-Ely WwTW Storm Overflow
DCWW101683a · 01327c9cW_WFD_PD_IMPImprovement
Improvements at Waste Water Treatment Works WWTW across permit parameters as per driver code under Water Framework Directive Regulations WFD to prevent deterioration.
WQ
RHYDLAFAR
Due 2026-27RHYDLAFAR ST STW
DCWW101632a · 5344f876W_WFD_PD_IMPImprovement
Improvements at Waste Water Treatment Works WWTW across permit parameters as per driver code under Water Framework Directive Regulations WFD to prevent deterioration. Those with CDC references are carried over from PR19/AMP7 under driver code W_WFD_PD_IMP and associated PR19 driver paper
WQ
RHIWSAESON (7CDC1106)
Due 2027-28RHIWSAESON STW RHIWSAESON LLANTRI STW
DCWW100803a · a4924a1eW_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
A SEWAGE PUMPING STATION SITUATED AT PARC CASTELL-Y-MYNACH, CREIGIAU, MID GLAMORGAN
Due 2029-30Water body only
DCWW100834a · 1b1c45a5W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
A SPS, FAIRVIEW PUMPING STATION, PONTYCLUN
Due 2029-30Fairview Storm Overflow
DCWW100835a · e12aec28W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
A SPS. DAN-Y-BRYN PUMPING STATION, REAR OF NO. 5 COWBRIDGE ROAD, PONTYCLUN
Due 2029-30Dan-y-Bryn Storm Overflow
DCWW100756a · 084444bfW_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
BROFISCIN FARM PUMPING STN, GROESFAEN
Due 2029-30Water body only
DCWW101582a · cb6018f2W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Brynsadler Pumping Station Clun Ely
Due 2029-30Brynsadler Storm Overflow
DCWW100750a · 3efaf84fW_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
BRYNTEG PARK PS BEDDAU
Due 2029-30Brynteg Park Storm Overflow
DCWW102291a · 196fbf54W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
BRYNTEG PARK PS, BEDDAU
Due 2029-30Brynteg Park Storm Overflow
DCWW101582a · eb316487W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Capel Farm PS Emergency Tonyrefai
Due 2029-30Maple Court Storm Overflow
DCWW100785a · 28931241W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
Capel Farm SPS, Tonyrefail
Due 2029-30Maple Court Storm Overflow
DCWW102677a · 08cb5525W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
CARDIFF GRANGETOWN THE MARL OFF AVONDALE
Due 2029-30Cardiff Western District Storm Overflow
DCWW102683a · 1366a07dW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
CARDIFF PENARTH ROAD WDPS
Due 2029-30Cardiff Western District Storm Overflow
DCWW100682a · a773ee55W_U_IMP6Improvement
Increasing storm tank capacity to provide adequate settlement and detention at WwTWs that were identified in PR19 and were subsequently deferred until PR24 with the written agreement of NRW
WQ
CARDIFF ST FAGANS
Due 2029-30St Fagans Storm Overflow
DCWW100742a · 2ff651ccW_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
CARDIFF WESTERN DISTRICT PUMPING STATION, PENARTH ROAD, CARDIFF
Due 2029-30Cardiff Western District Storm Overflow
DCWW100713a · 9ad0626eW_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
Cherry Tree Walk SPS, New Park, Talbot Green, Rhondda Cynon Taf, CF72 8RJ
Due 2029-30Water body only
DCWW102697a · 5796b930W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
COGAN FLOODING RELIEF SPS CSO
Due 2029-30Cogan Flooding Relief Storm Overflow
DCWW100795a · 2b0c15aaW_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
COGAN PUMPING STATION, NR PENARTH, S. GLAMORGAN
Due 2029-30Penarth Cogan Storm Overflow
DCWW101582a · e92a73f5W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Cogan SPS
Due 2029-30Penarth Cogan Storm Overflow
DCWW100790a · f2fcbe73W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
Copthorn Hotel & Business Park SPS
Due 2029-30Water body only
DCWW100664a · 4a71546bW_U_IMP6Improvement
Increasing storm tank capacity to provide adequate settlement and detention at WwTWs that were identified in PR19 and were subsequently deferred until PR24 with the written agreement of NRW
WQ
COSLECH
Due 2029-30Coslech WwTW Storm Overflow
DCWW100712a · da8f2f2fW_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
CREIGIAU PS
Due 2029-30Ffordd Dinefwr PS Storm Overflow
DCWW101582a · a17b2f58W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Creigiau Sewage Treatment Works Hoel Settled Storm
Due 2029-30Creigiau WwTW Storm Overflow
DCWW100793a · 07791bd7W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
CSO & EO at PENARTH HEAD PUMPING STATION, PENARTH, SOUTH GLAMORGAN
Due 2029-30Penarth Marina Storm Overflow
DCWW101582a · f2070cf2W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
CSO ADJACENT TO PARISH ROAD BEDDA
Due 2029-30Parish Road Beddau Storm Overflow
DCWW101582a · ef2ded9fW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
CSO at Cardiff Ely Plymouth Rd No 108
Due 2029-30Plymouth Wood Road Storm Overflow
DCWW101582a · 38523690W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
CSO at Penrhiwfer Ashdale Rd CSO, rear of No23
Due 2029-30Ashdale Road Storm Overflow
DCWW101582a · ae29a012W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
CSO at Tynybryn Road Tonyrefail R-C-T
Due 2029-30Tynybryn Road Storm Overflow
DCWW101582a · 2f741695W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Danybryn SPS
Due 2029-30Dan-y-Bryn Storm Overflow
DCWW102278a · ef712123W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
DYFFRYN ISAF STORM TANKS
Due 2029-30Dyffryn Isaf WwTW Storm Overflow
DCWW101582a · 1dbb5522W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
ELY VALLEY ROAD CSO,
Due 2029-30Ely Valley Road Storm Overflow
DCWW101582a · bb5136efW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Fairview SPS
Due 2029-30Fairview Storm Overflow
DCWW100813a · 16b54de4W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
Ffordd Llanbad SPS, Gilfach Goch, Rhondda Cynon Taff, CF39 8FL
Due 2029-30Water body only
DCWW100855a · 9aba2decW_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
Former Boot Hill Filling Station
Due 2029-30Water body only
DCWW101582a · d144e7a1W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Llanharry SPS
Due 2029-30Llanharry Storm Overflow
DCWW100751a · 80c71764W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
Llanharry SPS, Pontyclun, RCT
Due 2029-30Llanharry Storm Overflow
DCWW100749a · 7e58fd01W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
LLANTRISANT ROAD PUMPING STATION, ADJACENT TO NO. 23 MAPLE COURT, TONYREFAIL
Due 2029-30Maple Court Storm Overflow
DCWW100722a · 6bf6aebaW_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
Llwyn Passat SPS , Penarth Marina, Penarth CF64 1BW
Due 2029-30Water body only
DCWW101582a · 7bc7a754W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
MAES YR FELIN PUMPING STATION
Due 2029-30Maes-Y-Felin Storm Overflow
DCWW100792a · 24b2f452W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
MAES-YR-FELIN PUMPING STATION, PONTYCLUN, CSO
Due 2029-30Maes-Y-Felin Storm Overflow
DCWW100796a · caf49352W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
MARINA PUMPING STATION, PENARTH, S.GLAMORGAN
Due 2029-30Penarth Marina Storm Overflow
DCWW101582a · 7809d48dW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Mill St CSO, Tonyrefail
Due 2029-30Tonyrefail Police Station Storm Overflow
DCWW102279a · 4bfe7796W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
MISKIN (PONTYCLUN) PS
Due 2029-30Miskin Railway Storm Overflow
DCWW100772a · 6d970487W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
MISKIN ARMS PUMPING STATION
Due 2029-30Miskin Railway Storm Overflow
DCWW100719a · 9cc31333W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
MISKIN SEWAGE PUMPING STATION
Due 2029-30Miskin Railway Storm Overflow
DCWW101441a · 10b04f16W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
Mostyn Road SPS, Ely, Cardiff
Due 2029-30Water body only
DCWW101582a · 03efb79bW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
New Society Garage CSO
Due 2029-30Heol Saelm Garages Storm Overflow
DCWW100783a · 31dd9202W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
NORTH YSTRADOWEN PUMPING STATION, YSTRADOWEN, NR. PONTYCLUN, MID GLAMORGAN
Due 2029-30Ystradowen Storm Overflow
DCWW100740a · dc76a2aeW_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
PEN-Y-COEDCAE SEWAGE PUMPING STATION
Due 2029-30Penycoedcae Storm Overflow
DCWW100716a · 19799be0W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
Penarth Dock PS Penarth
Due 2029-30Penarth Cogan Storm Overflow
DCWW101582a · 41195256W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Penarth Llandough Moors Cardiff CSO, Cardiff
Due 2029-30Penarth Road Storm Overflow
DCWW100731a · aacf3733W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
Penarth Llandough Moors, Penarth Road, Cardiff West SPS
Due 2029-30Penarth Road Storm Overflow
DCWW102319a · 21761809W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Penarth Marina SPS CSO adj. Custom House
Due 2029-30Penarth Head Storm Overflow
DCWW102284a · da4a9212W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
PENYCOEDCAE PS
Due 2029-30Penycoedcae Storm Overflow
DCWW100791a · cace691fW_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
RHYD-Y-NANT PUMPING STATION, PONTYCLUN, CSO
Due 2029-30Rhyd-Y-Nant Storm Overflow
DCWW101582a · c480e680W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
RHYDYNANT PS (ADJ TO 49) PONTYCLUN
Due 2029-30Rhyd-Y-Nant Storm Overflow
DCWW100723a · cfee2156W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
Sloping Masonry SPS, Sloping Masonry, Penarth Marina, Penarth, CF64 1BW
Due 2029-30Water body only
DCWW100720a · 1c05bc31W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
SPS at Coslech STW,
Due 2029-30Coslech WwTW Storm Overflow
DCWW102457a · 1e8f8373W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
TALBOT GREEN HEOL MILES REAR OF NO 24
Due 2029-30Cardiff Road Talbot Green Storm Overflow
DCWW102292a · 56767365W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
TONYREFAIL WAUNRHYDD ROAD REAR OF
Due 2029-30Waunrhydd Road Storm Overflow
DCWW101582a · fd5690b1W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Tonyrefail, Mill St CSO
Due 2029-30Mill Street Tonyrefail Storm Overflow
DCWW100771a · ccbec529W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
WHITE BRIDGE PUMPING STATION, PETERSTON, SUPER ELY.
Due 2029-30Whitebridge Storm Overflow
DCWW101582a · 4a752845W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Whitebridge PS Peterston Super Ely
Due 2029-30Whitebridge Storm Overflow
DCWW101582a · fdbdaabfW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
YNYSDDU PUMPING STATION PONTYCLUN
Due 2029-30Ynysddu Storm Overflow
DCWW100741a · 0259c84fW_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
YNYSDDU PUMPING STATION, PONTYCLUN
Due 2029-30Ynysddu Storm Overflow
DCWW102335a · 68f5e0efW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
YSTRADOWEN (COWBRIDGE) NORTH PS BY A4222
Due 2029-30Ystradowen Storm Overflow
DCWW100845a · f7c4f3bcW_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
Ystradowen SPS, adjacent to A4222, Cowbridge, CF71 7SY
Due 2029-30Ystradowen Storm Overflow

80 of 80 measures shown. A measure whose completion date has passed is shown as Complete; the water company's actual delivery against it is reported to the regulator but not published here.

There is no public change log

NRW publishes the NEP as an open map layer, but there is no versioned public comparison or published reasons when a measure is re-dated or dropped. The only way to hold slippage to account is to archive every annual release and diff it yourself.

The 2027 pressure point

Most investigations must complete by 30 April 2027 to feed the 2030–35 programme. That date — not 2030 — is the one to hold: an investigation that slips past it cannot shape the next round of funded schemes.