What the regulator requires
A measure is a specific action the regulator requires the water company to take at a named site — to investigate a problem, keep monitoring it, or physically fix it — each with a completion date. These are the legally binding measures on record for this catchment: what each requires, and what to watch.
These measures are legally binding. Each one is a dated, site-specific requirement the company must deliver.
The National Environment Programme is how Natural Resources Wales turns statutory duties into named obligations at named sites, with a completion date attached. Where a measure requires a physical upgrade, NRW writes the result into the site's environmental permit — and from that point the requirement is criminally enforceable.
The measure itself is public. What is not published is the water company's action to comply with it — its delivery is reported to the regulator and scored, but the underlying work, and whether a measure has actually resolved the problem on the ground, is not on the public record. What to watch is slippage: a measure can be re-dated or re-scoped, and until the permit is varied the obligation has not changed.
What the types mean
A physical upgrade — bigger storage, better treatment, more capacity. This is the only type that actually fixes the problem on the ground.
A study of the cause. It produces a report, not a repair — an investigation must lead to an improvement before anything changes.
Installing or running instruments to measure the problem. Necessary evidence, but on its own it fixes nothing — it too has to be followed by an improvement.
So an overflow whose only measures are investigations or monitoring is being looked at, not yet fixed. On the gaps page, only a measure that is still active counts as action — a measure completed while the overflow is still failing does not.
| Reference | Driver | Type | What it requires | Status | Attached to |
|---|---|---|---|---|---|
| DCWW100154a · 06b86d5a | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ Cardiff ST FAGANS STW | Complete 2025-26 | St Fagans Storm Overflow |
| DCWW100171a · c8fee5f9 | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ COSLECH STW | Complete 2025-26 | Coslech WwTW Storm Overflow |
| DCWW100174a · 44412bd8 | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ CREIGIAU SEWAGE TREATMENT WORKS HOE | Complete 2025-26 | Creigiau WwTW Storm Overflow |
| DCWW100197a · 142750a8 | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ DUFFRYN ISAF SEWAGE TREATMENT WORKS | Complete 2025-26 | Dyffryn Isaf WwTW Storm Overflow |
| DCWW100338a · 22b31f95 | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ PETERSTON SUPER ELY STW CSO MAIN AV | Complete 2025-26 | Peterston-super-Ely WwTW Storm Overflow |
| DCWW100360a · f49244e1 | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ RHIWSAESON STW RHIWSAESON LLANTRI | Complete 2025-26 | Rhiwsaeson WwTW Storm Overflow |
| DCWW100093a · b6bef5e0 | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ RHYDLAFAR STW ST FAGANS CARDIFF | Complete 2025-26 | Rhydlafar WwTW Storm Overflow |
| DCWW102155a · 840a1d5b | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in ''high priority locations'' in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ CARDIFF ELY MILL ROAD/MUSTON ROAD | Due 2026-27 | Mill Road 1 Storm Overflow |
| DCWW101599a · c45b8f6c | W_WFD_PG_IMP4 | Improvement | Implementation of actions to achieve good status at a waterbody and / or site level due to Phosphorus relating to Reasons for Not Achieving Good (RNAGs) identified against water company assets or activities and phosphorus status of the waterbody. WQ COSLECH | Due 2026-27 | SOUTH ELY VALLEY STW |
| DCWW101600a · e03bd6fe | W_WFD_PG_IMP4 | Improvement | Implementation of actions to achieve good status at a waterbody and / or site level due to Phosphorus relating to Reasons for Not Achieving Good (RNAGs) identified against water company assets or activities and phosphorus status of the waterbody. WQ Dyffryn Isaf | Due 2026-27 | Water body only |
| DCWW102151a · 462e286c | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in ''high priority locations'' in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ ELY RACECOURSE CSO, CARDIFF | Due 2026-27 | Penally Road Ely Cardiff Overflow |
| DCWW102188a · 23ea1be7 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in ''high priority locations'' in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Penarth Head SPS CSO | Due 2026-27 | Penarth Marina Storm Overflow |
| DCWW102120a · e1f683da | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in ''high priority locations'' in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ PETERSTON-SUPER-ELY STW STORM | Due 2026-27 | Peterston-super-Ely WwTW Storm Overflow |
| DCWW101683a · 01327c9c | W_WFD_PD_IMP | Improvement | Improvements at Waste Water Treatment Works WWTW across permit parameters as per driver code under Water Framework Directive Regulations WFD to prevent deterioration. WQ RHYDLAFAR | Due 2026-27 | RHYDLAFAR ST STW |
| DCWW101632a · 5344f876 | W_WFD_PD_IMP | Improvement | Improvements at Waste Water Treatment Works WWTW across permit parameters as per driver code under Water Framework Directive Regulations WFD to prevent deterioration. Those with CDC references are carried over from PR19/AMP7 under driver code W_WFD_PD_IMP and associated PR19 driver paper WQ RHIWSAESON (7CDC1106) | Due 2027-28 | RHIWSAESON STW RHIWSAESON LLANTRI STW |
| DCWW100803a · a4924a1e | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ A SEWAGE PUMPING STATION SITUATED AT PARC CASTELL-Y-MYNACH, CREIGIAU, MID GLAMORGAN | Due 2029-30 | Water body only |
| DCWW100834a · 1b1c45a5 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ A SPS, FAIRVIEW PUMPING STATION, PONTYCLUN | Due 2029-30 | Fairview Storm Overflow |
| DCWW100835a · e12aec28 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ A SPS. DAN-Y-BRYN PUMPING STATION, REAR OF NO. 5 COWBRIDGE ROAD, PONTYCLUN | Due 2029-30 | Dan-y-Bryn Storm Overflow |
| DCWW100756a · 084444bf | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ BROFISCIN FARM PUMPING STN, GROESFAEN | Due 2029-30 | Water body only |
| DCWW101582a · cb6018f2 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Brynsadler Pumping Station Clun Ely | Due 2029-30 | Brynsadler Storm Overflow |
| DCWW100750a · 3efaf84f | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ BRYNTEG PARK PS BEDDAU | Due 2029-30 | Brynteg Park Storm Overflow |
| DCWW102291a · 196fbf54 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ BRYNTEG PARK PS, BEDDAU | Due 2029-30 | Brynteg Park Storm Overflow |
| DCWW101582a · eb316487 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Capel Farm PS Emergency Tonyrefai | Due 2029-30 | Maple Court Storm Overflow |
| DCWW100785a · 28931241 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ Capel Farm SPS, Tonyrefail | Due 2029-30 | Maple Court Storm Overflow |
| DCWW102677a · 08cb5525 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ CARDIFF GRANGETOWN THE MARL OFF AVONDALE | Due 2029-30 | Cardiff Western District Storm Overflow |
| DCWW102683a · 1366a07d | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ CARDIFF PENARTH ROAD WDPS | Due 2029-30 | Cardiff Western District Storm Overflow |
| DCWW100682a · a773ee55 | W_U_IMP6 | Improvement | Increasing storm tank capacity to provide adequate settlement and detention at WwTWs that were identified in PR19 and were subsequently deferred until PR24 with the written agreement of NRW WQ CARDIFF ST FAGANS | Due 2029-30 | St Fagans Storm Overflow |
| DCWW100742a · 2ff651cc | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ CARDIFF WESTERN DISTRICT PUMPING STATION, PENARTH ROAD, CARDIFF | Due 2029-30 | Cardiff Western District Storm Overflow |
| DCWW100713a · 9ad0626e | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ Cherry Tree Walk SPS, New Park, Talbot Green, Rhondda Cynon Taf, CF72 8RJ | Due 2029-30 | Water body only |
| DCWW102697a · 5796b930 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ COGAN FLOODING RELIEF SPS CSO | Due 2029-30 | Cogan Flooding Relief Storm Overflow |
| DCWW100795a · 2b0c15aa | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ COGAN PUMPING STATION, NR PENARTH, S. GLAMORGAN | Due 2029-30 | Penarth Cogan Storm Overflow |
| DCWW101582a · e92a73f5 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Cogan SPS | Due 2029-30 | Penarth Cogan Storm Overflow |
| DCWW100790a · f2fcbe73 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ Copthorn Hotel & Business Park SPS | Due 2029-30 | Water body only |
| DCWW100664a · 4a71546b | W_U_IMP6 | Improvement | Increasing storm tank capacity to provide adequate settlement and detention at WwTWs that were identified in PR19 and were subsequently deferred until PR24 with the written agreement of NRW WQ COSLECH | Due 2029-30 | Coslech WwTW Storm Overflow |
| DCWW100712a · da8f2f2f | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ CREIGIAU PS | Due 2029-30 | Ffordd Dinefwr PS Storm Overflow |
| DCWW101582a · a17b2f58 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Creigiau Sewage Treatment Works Hoel Settled Storm | Due 2029-30 | Creigiau WwTW Storm Overflow |
| DCWW100793a · 07791bd7 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ CSO & EO at PENARTH HEAD PUMPING STATION, PENARTH, SOUTH GLAMORGAN | Due 2029-30 | Penarth Marina Storm Overflow |
| DCWW101582a · f2070cf2 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ CSO ADJACENT TO PARISH ROAD BEDDA | Due 2029-30 | Parish Road Beddau Storm Overflow |
| DCWW101582a · ef2ded9f | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ CSO at Cardiff Ely Plymouth Rd No 108 | Due 2029-30 | Plymouth Wood Road Storm Overflow |
| DCWW101582a · 38523690 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ CSO at Penrhiwfer Ashdale Rd CSO, rear of No23 | Due 2029-30 | Ashdale Road Storm Overflow |
| DCWW101582a · ae29a012 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ CSO at Tynybryn Road Tonyrefail R-C-T | Due 2029-30 | Tynybryn Road Storm Overflow |
| DCWW101582a · 2f741695 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Danybryn SPS | Due 2029-30 | Dan-y-Bryn Storm Overflow |
| DCWW102278a · ef712123 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ DYFFRYN ISAF STORM TANKS | Due 2029-30 | Dyffryn Isaf WwTW Storm Overflow |
| DCWW101582a · 1dbb5522 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ ELY VALLEY ROAD CSO, | Due 2029-30 | Ely Valley Road Storm Overflow |
| DCWW101582a · bb5136ef | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Fairview SPS | Due 2029-30 | Fairview Storm Overflow |
| DCWW100813a · 16b54de4 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ Ffordd Llanbad SPS, Gilfach Goch, Rhondda Cynon Taff, CF39 8FL | Due 2029-30 | Water body only |
| DCWW100855a · 9aba2dec | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ Former Boot Hill Filling Station | Due 2029-30 | Water body only |
| DCWW101582a · d144e7a1 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Llanharry SPS | Due 2029-30 | Llanharry Storm Overflow |
| DCWW100751a · 80c71764 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ Llanharry SPS, Pontyclun, RCT | Due 2029-30 | Llanharry Storm Overflow |
| DCWW100749a · 7e58fd01 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ LLANTRISANT ROAD PUMPING STATION, ADJACENT TO NO. 23 MAPLE COURT, TONYREFAIL | Due 2029-30 | Maple Court Storm Overflow |
| DCWW100722a · 6bf6aeba | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ Llwyn Passat SPS , Penarth Marina, Penarth CF64 1BW | Due 2029-30 | Water body only |
| DCWW101582a · 7bc7a754 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ MAES YR FELIN PUMPING STATION | Due 2029-30 | Maes-Y-Felin Storm Overflow |
| DCWW100792a · 24b2f452 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ MAES-YR-FELIN PUMPING STATION, PONTYCLUN, CSO | Due 2029-30 | Maes-Y-Felin Storm Overflow |
| DCWW100796a · caf49352 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ MARINA PUMPING STATION, PENARTH, S.GLAMORGAN | Due 2029-30 | Penarth Marina Storm Overflow |
| DCWW101582a · 7809d48d | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Mill St CSO, Tonyrefail | Due 2029-30 | Tonyrefail Police Station Storm Overflow |
| DCWW102279a · 4bfe7796 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ MISKIN (PONTYCLUN) PS | Due 2029-30 | Miskin Railway Storm Overflow |
| DCWW100772a · 6d970487 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ MISKIN ARMS PUMPING STATION | Due 2029-30 | Miskin Railway Storm Overflow |
| DCWW100719a · 9cc31333 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ MISKIN SEWAGE PUMPING STATION | Due 2029-30 | Miskin Railway Storm Overflow |
| DCWW101441a · 10b04f16 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ Mostyn Road SPS, Ely, Cardiff | Due 2029-30 | Water body only |
| DCWW101582a · 03efb79b | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ New Society Garage CSO | Due 2029-30 | Heol Saelm Garages Storm Overflow |
| DCWW100783a · 31dd9202 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ NORTH YSTRADOWEN PUMPING STATION, YSTRADOWEN, NR. PONTYCLUN, MID GLAMORGAN | Due 2029-30 | Ystradowen Storm Overflow |
| DCWW100740a · dc76a2ae | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ PEN-Y-COEDCAE SEWAGE PUMPING STATION | Due 2029-30 | Penycoedcae Storm Overflow |
| DCWW100716a · 19799be0 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ Penarth Dock PS Penarth | Due 2029-30 | Penarth Cogan Storm Overflow |
| DCWW101582a · 41195256 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Penarth Llandough Moors Cardiff CSO, Cardiff | Due 2029-30 | Penarth Road Storm Overflow |
| DCWW100731a · aacf3733 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ Penarth Llandough Moors, Penarth Road, Cardiff West SPS | Due 2029-30 | Penarth Road Storm Overflow |
| DCWW102319a · 21761809 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Penarth Marina SPS CSO adj. Custom House | Due 2029-30 | Penarth Head Storm Overflow |
| DCWW102284a · da4a9212 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ PENYCOEDCAE PS | Due 2029-30 | Penycoedcae Storm Overflow |
| DCWW100791a · cace691f | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ RHYD-Y-NANT PUMPING STATION, PONTYCLUN, CSO | Due 2029-30 | Rhyd-Y-Nant Storm Overflow |
| DCWW101582a · c480e680 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ RHYDYNANT PS (ADJ TO 49) PONTYCLUN | Due 2029-30 | Rhyd-Y-Nant Storm Overflow |
| DCWW100723a · cfee2156 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ Sloping Masonry SPS, Sloping Masonry, Penarth Marina, Penarth, CF64 1BW | Due 2029-30 | Water body only |
| DCWW100720a · 1c05bc31 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ SPS at Coslech STW, | Due 2029-30 | Coslech WwTW Storm Overflow |
| DCWW102457a · 1e8f8373 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ TALBOT GREEN HEOL MILES REAR OF NO 24 | Due 2029-30 | Cardiff Road Talbot Green Storm Overflow |
| DCWW102292a · 56767365 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ TONYREFAIL WAUNRHYDD ROAD REAR OF | Due 2029-30 | Waunrhydd Road Storm Overflow |
| DCWW101582a · fd5690b1 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Tonyrefail, Mill St CSO | Due 2029-30 | Mill Street Tonyrefail Storm Overflow |
| DCWW100771a · ccbec529 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ WHITE BRIDGE PUMPING STATION, PETERSTON, SUPER ELY. | Due 2029-30 | Whitebridge Storm Overflow |
| DCWW101582a · 4a752845 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Whitebridge PS Peterston Super Ely | Due 2029-30 | Whitebridge Storm Overflow |
| DCWW101582a · fdbdaabf | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ YNYSDDU PUMPING STATION PONTYCLUN | Due 2029-30 | Ynysddu Storm Overflow |
| DCWW100741a · 0259c84f | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ YNYSDDU PUMPING STATION, PONTYCLUN | Due 2029-30 | Ynysddu Storm Overflow |
| DCWW102335a · 68f5e0ef | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ YSTRADOWEN (COWBRIDGE) NORTH PS BY A4222 | Due 2029-30 | Ystradowen Storm Overflow |
| DCWW100845a · f7c4f3bc | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ Ystradowen SPS, adjacent to A4222, Cowbridge, CF71 7SY | Due 2029-30 | Ystradowen Storm Overflow |
80 of 80 measures shown. A measure whose completion date has passed is shown as Complete; the water company's actual delivery against it is reported to the regulator but not published here.
There is no public change log
NRW publishes the NEP as an open map layer, but there is no versioned public comparison or published reasons when a measure is re-dated or dropped. The only way to hold slippage to account is to archive every annual release and diff it yourself.
The 2027 pressure point
Most investigations must complete by 30 April 2027 to feed the 2030–35 programme. That date — not 2030 — is the one to hold: an investigation that slips past it cannot shape the next round of funded schemes.