What the regulator requires
A measure is a specific action the regulator requires the water company to take at a named site — to investigate a problem, keep monitoring it, or physically fix it — each with a completion date. These are the legally binding measures on record for this catchment: what each requires, and what to watch.
These measures are legally binding. Each one is a dated, site-specific requirement the company must deliver.
The Water Industry National Environment Programme is how the Environment Agency turns statutory duties into named obligations at named sites, with a completion date attached. Where a measure requires a physical upgrade, the Agency writes the result into the site's environmental permit — and from that point the requirement is criminally enforceable.
The measure itself is public. What is not published is the water company's action to comply with it — its delivery is reported to the regulator and scored, but the underlying work, and whether a measure has actually resolved the problem on the ground, is not on the public record. What to watch is slippage: a measure can be re-dated or re-scoped, and until the permit is varied the obligation has not changed.
What the types mean
A physical upgrade — bigger storage, better treatment, more capacity. This is the only type that actually fixes the problem on the ground.
A study of the cause. It produces a report, not a repair — an investigation must lead to an improvement before anything changes.
Installing or running instruments to measure the problem. Necessary evidence, but on its own it fixes nothing — it too has to be followed by an improvement.
So an overflow whose only measures are investigations or monitoring is being looked at, not yet fixed. On the gaps page, only a measure that is still active counts as action — a measure completed while the overflow is still failing does not.
| Reference | Driver | Type | What it requires | Status | Attached to |
|---|---|---|---|---|---|
| 08SO102529 · a | U_MON4 | Monitoring | U_MON4c - PR24 U_MON4 from U_INV2 investigation including civils Beckley WTW | Due 2026-27 | BECKLEY |
| 08SO102441 · a | U_MON4 | Monitoring | U_MON4c - PR24 U_MON4 from U_INV2 investigation including civils Benenden WTW | Due 2026-27 | BENENDEN |
| 08SO102685 · a | U_MON3 | Monitoring | U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor BENENDEN WWTW | Due 2026-27 | Tributary of Newmill Channel upstream of Rolvenden |
| 08SO102409 · a | U_MON4 | Monitoring | U_MON4b - Move AMP7 U_INV2 driver output to 2-minute flow monitoring Burwash Common WTW | Due 2026-27 | BURWASH COMMON |
| 08SO102703 · a | U_MON3 | Monitoring | U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor BURWASH COMMON WWTW | Due 2026-27 | Dudwell |
| 08SO102514 · a | U_MON4 | Monitoring | U_MON4c - PR24 U_MON4 from U_INV2 investigation including civils Burwash Village WTW | Due 2026-27 | BURWASH VILLAGE |
| 08SO102516 · a | U_MON4 | Monitoring | U_MON4b - Move AMP7 U_INV2 driver output to 2-minute flow monitoring Crouch Farm Mayfield WTW | Due 2026-27 | CROUCH FARM MAYFIELD |
| 08SO102725 · a | U_MON3 | Monitoring | U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor CROUCH FARM MAYFIELD WWTW | Due 2026-27 | Coggins Mill Stream |
| 08SO102563 · a | U_MON4 | Monitoring | U_MON4b - Move AMP7 U_INV2 driver output to 2-minute flow monitoring HAWKHURST NORTH WTW | Due 2026-27 | Hexden Channel |
| 08SO102776 · a | U_MON3 | Monitoring | U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor HAWKHURST NORTH WWTW | Due 2026-27 | Hexden Channel |
| 08SO102564 · a | U_MON4 | Monitoring | U_MON4b - Move AMP7 U_INV2 driver output to 2-minute flow monitoring HAWKHURST SOUTH WTW | Due 2026-27 | Kent Ditch |
| 08SO102777 · a | U_MON3 | Monitoring | U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor HAWKHURST SOUTH WWTW | Due 2026-27 | Kent Ditch |
| 08SO102470 · a | U_MON4 | Monitoring | U_MON4b - Move AMP7 U_INV2 driver output to 2-minute flow monitoring Hurst Green WTW | Due 2026-27 | HURST GREEN |
| 08SO102569 · a | U_MON4 | Monitoring | U_MON4b - Move AMP7 U_INV2 driver output to 2-minute flow monitoring IDEN WTW | Due 2026-27 | IDEN |
| 08SO102435 · a | U_MON4 | Monitoring | U_MON4b - Move AMP7 U_INV2 driver output to 2-minute flow monitoring Meres Farm Mayfield WTW | Due 2026-27 | MERES FARM MAYFIELD |
| 08SO104833 · a | U_MON4 | Monitoring | U_MON4b - Move AMP7 U_INV2 driver output to 2-minute flow monitoring MILL CORNER NORTHIAM WTW | Due 2026-27 | MILL CORNER NORTHIAM |
| 08SO102538 · a | U_MON4 | Monitoring | U_MON4c - PR24 U_MON4 from U_INV2 investigation including civils Rolvenden Layne WTW | Due 2026-27 | ROLVENDEN LAYNE |
| 08SO102859 · a | U_MON3 | Monitoring | U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor ROLVENDEN LAYNE WWTW | Due 2026-27 | Hexden Channel |
| 08SO102539 · a | U_MON4 | Monitoring | U_MON4b - Move AMP7 U_INV2 driver output to 2-minute flow monitoring Sandhurst WTW | Due 2026-27 | SANDHURST |
| 08SO102865 · a | U_MON3 | Monitoring | U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor SANDHURST WWTW | Due 2026-27 | Hexden Channel |
| 08SO102589 · a | U_MON4 | Monitoring | U_MON4b - Move AMP7 U_INV2 driver output to 2-minute flow monitoring TENTERDEN WTW | Due 2026-27 | Newmill Channel downstream of A28 |
| 08SO102902 · a | U_MON3 | Monitoring | U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor TENTERDEN WWTW | Due 2026-27 | Newmill Channel downstream of A28 |
| 08SO104735 · a | U_MON4 | Monitoring | U_MON4b - Move AMP7 U_INV2 driver output to 2-minute flow monitoring Washwell Lane Wadhurst | Due 2026-27 | WASHWELL LANE WADHURST |
| 08SO102917 · a | U_MON3 | Monitoring | U_MON3a: MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor WASHWELL LANE WADHURST WWTW | Due 2026-27 | Tidebrook |
| 08SO102462 · a | U_MON4 | Monitoring | U_MON4b - Move AMP7 U_INV2 driver output to 2-minute flow monitoring Wittersham WTW | Due 2026-27 | WITTERSHAM |
| 08SO101112 · b | WFD_NDLS_Chem1 | No deterioration | Prevent any deterioration Quickbourne Lane Northam STW | Due 2026-27 | Lower Rother from Etchingham to Scot's Float |
| 08SO101089 · a | WFD_NDLS_Chem2 | No deterioration | Prevent any deterioration Quickbourne Lane WTW | Due 2026-27 | Lower Rother from Etchingham to Scot's Float |
| 08SO104950 · pv | EnvAct_INV4 | Investigation | Investigation to determine the target number of spills from the storm overflow to protect the environment and demonstrate no local adverse ecological impact BURWASH COMMON SSO | Due 2027-28 | Dudwell |
| 08SO104950 · pm | EnvAct_INV4 | Investigation | Investigation to determine the target number of spills from the storm overflow to protect the environment and demonstrate no local adverse ecological impact CASTLE TERRACE HAWKHURST CSO | Due 2027-28 | Hexden Channel |
| 08SO103797 · a | WFD_INV | Investigation | Investigations for actions to improve water quality in terms of relevant WFD status objectives. CROUCH FARM MAYFIELD WTW | Due 2027-28 | CROUCH FARM MAYFIELD |
| 08SO104950 · r | EnvAct_INV4 | Investigation | Investigation to determine the target number of spills from the storm overflow to protect the environment and demonstrate no local adverse ecological impact HAWKHURST NORTH SSO | Due 2027-28 | Hexden Channel |
| 08SO104950 · pe | EnvAct_INV4 | Investigation | Investigation to determine the target number of spills from the storm overflow to protect the environment and demonstrate no local adverse ecological impact HAWKHURST SOUTH SSO | Due 2027-28 | Kent Ditch |
| 08SO103802 · a | WFD_INV | Investigation | Investigations for actions to improve water quality in terms of relevant WFD status objectives. HAWKHURST SOUTH WTW | Due 2027-28 | Kent Ditch |
| 08SO103811 · a | WFD_INV | Investigation | Investigations for actions to improve water quality in terms of relevant WFD status objectives. MERES FARM MAYFIELD WTW | Due 2027-28 | MERES FARM MAYFIELD |
| 08SO104950 · qb | EnvAct_INV4 | Investigation | Investigation to determine the target number of spills from the storm overflow to protect the environment and demonstrate no local adverse ecological impact MILL CORNER NORTHIAM CSO | Due 2027-28 | Lower Rother from Etchingham to Scot's Float |
| 08SO103812 · a | WFD_INV | Investigation | Investigations for actions to improve water quality in terms of relevant WFD status objectives. MILL CORNER NORTHIAM WTW | Due 2027-28 | MILL CORNER NORTHIAM |
| 08SO104950 · q | EnvAct_INV4 | Investigation | Investigation to determine the target number of spills from the storm overflow to protect the environment and demonstrate no local adverse ecological impact SANDHURST SSO | Due 2027-28 | Hexden Channel |
| 08SO103826 · a | WFD_INV | Investigation | Investigations for actions to improve water quality in terms of relevant WFD status objectives. TICEHURST WTW | Due 2027-28 | Limden |
| 08SO104074 · a | WFD_IMPg | Improvement | Amend Total P permit BURWASH COMMON | Due 2029-30 | BURWASH COMMON |
| 08SO104080 · a | WFD_IMPg | Improvement | Amend Total P permit CROUCH FARM MAYFIELD | Due 2029-30 | CROUCH FARM MAYFIELD |
| 08SO100126 · a | EnvAct_IMP2 | Improvement | SuDS + Storage HAWKHURST NORTH SSO | Due 2029-30 | HEXDEN CHANNEL |
| 08SO104041 · a | WFD_ND | No deterioration | Amend WFD ND BOD permit HAWKHURST SOUTH | Due 2029-30 | Kent Ditch |
| 08SO103918 · a | EnvAct_IMP2 | Improvement | SuDS + Storage MILL CORNER NORTHIAM CSO | Due 2029-30 | Lower Rother from Etchingham to Scot's Float |
| 08SO101112 · a | WFD_IMP_CHEM | Improvement | Deliver a physical improvement Quickbourne Lane Northam STW | Due 2029-30 | Lower Rother from Etchingham to Scot's Float |
| 08SO104098 · a | WFD_IMPm | Improvement | Amend Total P permit ROLVENDEN LAYNE | Due 2029-30 | ROLVENDEN LAYNE |
| 08SO103957 · a | EnvAct_IMP2 | Improvement | Wetland + Lining SANDHURST SSO | Due 2029-30 | Hexden Channel |
| 08SO104047 · a | WFD_ND | No deterioration | Amend WFD ND BOD permit TICEHURST | Due 2029-30 | Limden |
| 08SO104104 · a | WFD_IMPm | Improvement | Amend Total P permit WASHWELL LANE WADHURST | Due 2029-30 | WASHWELL LANE WADHURST |
| 08SO103906 · a | EnvAct_IMP2 | Improvement | SuDS + Storage HAWKHURST SOUTH SSO | Due 2034-35 | Kent Ditch |
| 08SO103960 · a | EnvAct_IMP4 | Improvement | SuDS + Storage QUICKBOURNE LANE NORTHIAM SSO | Due 2034-35 | Lower Rother from Etchingham to Scot's Float |
50 of 50 measures shown. A measure whose completion date has passed is shown as Complete; the water company's actual delivery against it is reported to the regulator but not published here.
There is no public change log
The live WINEP spreadsheet is internal, and there is no versioned public comparison or published reasons when a measure is re-dated or dropped. The only way to hold slippage to account is to archive every annual release and diff it yourself.
The 2027 pressure point
Most investigations must complete by 30 April 2027 to feed the 2030–35 programme. That date — not 2030 — is the one to hold: an investigation that slips past it cannot shape the next round of funded schemes.