← Military Road Iden, - 108286

Spill evidence · River Hub

Military Road Iden, - 108286

Pumping station overflow · SWS00567 · feeds IDEN
Wet weather

The discharge

Spill day
Sunday, 25 August 2024
Started
25 Aug 2024, 03:33
Ended
25 Aug 2024, 04:00
Duration
26 minutes 30 seconds
Receiving water
Lower Rother from Etchingham to Scot's Float
Parish
Playden

Rainfall evidence

Daily rainfall at the matched gauge (Pett) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
25/08/2024 (spill day)2.93 mmrain
24/08/202419.16 mmrain
23/08/20244.44 mmrain
22/08/20242.21 mmrain
21/08/20240 mmdry

River flow that day: 1.055 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 10.2 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
Yes — the treatment works' own overflow stayed shut that day, so capacity was available. Avoidable.
EA annual return (2024)
68 counted spills · 810 h total
Monitor uptime (2024)
100% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SWS00567). Rainfall: EA Hydrology gauge 82ae369b-b054-4414-9baf-bfc8e3030eea. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by Eastern Rother Data.