What the regulator requires
A measure is a specific action the regulator requires the water company to take at a named site — to investigate a problem, keep monitoring it, or physically fix it — each with a completion date. These are the legally binding measures on record for this catchment: what each requires, and what to watch.
These measures are legally binding. Each one is a dated, site-specific requirement the company must deliver.
The National Environment Programme is how Natural Resources Wales turns statutory duties into named obligations at named sites, with a completion date attached. Where a measure requires a physical upgrade, NRW writes the result into the site's environmental permit — and from that point the requirement is criminally enforceable.
The measure itself is public. What is not published is the water company's action to comply with it — its delivery is reported to the regulator and scored, but the underlying work, and whether a measure has actually resolved the problem on the ground, is not on the public record. What to watch is slippage: a measure can be re-dated or re-scoped, and until the permit is varied the obligation has not changed.
What the types mean
A physical upgrade — bigger storage, better treatment, more capacity. This is the only type that actually fixes the problem on the ground.
A study of the cause. It produces a report, not a repair — an investigation must lead to an improvement before anything changes.
Installing or running instruments to measure the problem. Necessary evidence, but on its own it fixes nothing — it too has to be followed by an improvement.
So an overflow whose only measures are investigations or monitoring is being looked at, not yet fixed. On the gaps page, only a measure that is still active counts as action — a measure completed while the overflow is still failing does not.
| Reference | Driver | Type | What it requires | Status | Attached to |
|---|---|---|---|---|---|
| DCWW100301a · a7ef2bd9 | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ LOWER CORRIS STW | Complete 2025-26 | Corris WwTW Storm Overflow |
| DCWW100302a · 28cda74a | W_U_MON3 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows WQ MACHYNLLETH STW | Complete 2025-26 | Machynlleth WwTW Inlet Storm Overflow |
| DCWW102221a · d804eea2 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in ''high priority locations'' in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ ABERDYFI | Due 2026-27 | Aberdyfi Storm Overflow |
| DCWW100204a · 96846e80 | W_U_MON4 | Monitoring | MCERTS certified Flow Passed Forward (FPF) overflow operation at WwTW or last in line Sewage Pumping Station overflows WQ ESGAIRGEILIOG CEINWS | Due 2026-27 | Ceinws Esgairgeiliog Storm Overflow |
| DCWW100635a · ee31d24f | W_U_IMP5 | Improvement | Increasing Flow Passed Forward (FPF) flow at WwTW’s that were identified in PR19 as having low permitted FPF / DWF (Dry Weather Flow) ratios and were subsequently deferred until PR24 with the written agreement of NRW WQ MACHYNLLETH | Due 2027-28 | Machynlleth WwTW Inlet Storm Overflow |
| DCWW101582a · a21c0437 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Aberangell No1 PS | Due 2029-30 | Afon Angell Bridge Aberangell Storm Overflow |
| DCWW101234a · 15f92b57 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ ABERANGELL NO1 PS, NR 2 WALTON TERR, ABERANGELL, MACHYNLLETH | Due 2029-30 | Afon Angell Bridge Aberangell Storm Overflow |
| DCWW101283a · c15e0718 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ ABERDYFI WHARF SEWAGE PUMPING STATION | Due 2029-30 | Aberdyfi Storm Overflow |
| DCWW101988a · 8e9ec2ba | W_U_O_IMP1 | Improvement | Action to implement improvements to overflows classified as Unsatisfactory WQ CEINWS ESGAIRGEILIOG | Due 2029-30 | Ceinws Esgairgeiliog Storm Overflow |
| DCWW101149a · a9617642 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ CEMAES PS | Due 2029-30 | Water body only |
| DCWW101156a · 332fe30e | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ COMMINS COCH SEWAGE PUMPING STATION, COMMINS COCH | Due 2029-30 | Commins Coch Storm Overflow |
| DCWW101148a · 884623da | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ CWM LLINAU PS | Due 2029-30 | Water body only |
| DCWW101549a · 9f6163d4 | W_FISH_IMP1 | Improvement | Implementation of actions to prevent or mitigate causes of entrainment or impediment to fish passage. Including removal of assets or deliver / install / construct fish passage solutions at sites where water company assets have been identified to impede fish passage, to include sites where their assets are the barrier in it’s entirety, or where their asset forms part of the barrier preventing or restricting fish passage. This includes both up and downstream fish passage. Fish Fish Barrier Mitigation at asset 50534797 | Due 2029-30 | Water body only |
| DCWW102790a · eb311f06 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ GARSIWN DITCH | Due 2029-30 | Garsiwn Ditch Storm Overflow |
| DCWW102458a · ad6ced79 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ LLAN-LLANBRYNMAIR PS | Due 2029-30 | Bontdolgadfan Storm Overflow |
| DCWW101150a · 01dc4ba2 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ LLANWRIN PS MACHYNLLETH | Due 2029-30 | Water body only |
| DCWW101582a · d7b7b280 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Machynlleth - Doll Street CSO | Due 2029-30 | Heol Y Doll Machynlleth Storm Overflow |
| DCWW101153a · da42adfc | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ MACHYNLLETH SEWAGE TREATMENT WORKS | Due 2029-30 | Machynlleth WwTW Inlet Storm Overflow |
| DCWW101582a · 70f193c6 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ MACHYNLLETH STW CSO | Due 2029-30 | Machynlleth WwTW Settled Storm Overflow |
| DCWW101582a · 91889633 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ Minffordd St CSO, Corris | Due 2029-30 | Minffordd Street Corris Storm Overflow |
| DCWW101216a · 000cd550 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ PENEGOES PUMPING STATION | Due 2029-30 | Water body only |
| DCWW102531a · 520915d8 | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ TALYBONT (NE OF ABERYSTWYTH) PS | Due 2029-30 | Talybont Overflow |
| DCWW101252a · 16689ff1 | W_U_MON6 | Monitoring | MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations WQ YNYSLAS PUMPING STATION | Due 2029-30 | East of Ynyslas Beach Overflow |
| DCWW102608a · 21a851ee | W_U_O_INV1 | Investigation | Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes WQ YNYSLAS SPS | Due 2029-30 | East of Ynyslas Beach Overflow |
24 of 24 measures shown. A measure whose completion date has passed is shown as Complete; the water company's actual delivery against it is reported to the regulator but not published here.
There is no public change log
NRW publishes the NEP as an open map layer, but there is no versioned public comparison or published reasons when a measure is re-dated or dropped. The only way to hold slippage to account is to archive every annual release and diff it yourself.
The 2027 pressure point
Most investigations must complete by 30 April 2027 to feed the 2030–35 programme. That date — not 2030 — is the one to hold: an investigation that slips past it cannot shape the next round of funded schemes.