A measure is a specific action the regulator requires the water company to take at a named site — to investigate a problem, keep monitoring it, or physically fix it — each with a completion date. These are the legally binding measures on record for this catchment: what each requires, and what to watch.

These measures are legally binding. Each one is a dated, site-specific requirement the company must deliver.

The National Environment Programme is how Natural Resources Wales turns statutory duties into named obligations at named sites, with a completion date attached. Where a measure requires a physical upgrade, NRW writes the result into the site's environmental permit — and from that point the requirement is criminally enforceable.

The measure itself is public. What is not published is the water company's action to comply with it — its delivery is reported to the regulator and scored, but the underlying work, and whether a measure has actually resolved the problem on the ground, is not on the public record. What to watch is slippage: a measure can be re-dated or re-scoped, and until the permit is varied the obligation has not changed.

What the types mean

Improvement

A physical upgrade — bigger storage, better treatment, more capacity. This is the only type that actually fixes the problem on the ground.

Investigation

A study of the cause. It produces a report, not a repair — an investigation must lead to an improvement before anything changes.

Monitoring

Installing or running instruments to measure the problem. Necessary evidence, but on its own it fixes nothing — it too has to be followed by an improvement.

So an overflow whose only measures are investigations or monitoring is being looked at, not yet fixed. On the gaps page, only a measure that is still active counts as action — a measure completed while the overflow is still failing does not.

24
Measures in this catchment
NEP, current record
22
Still active
not yet past their date
2
Assumed complete
completion date has passed
3
Are physical improvements
the rest investigate or monitor
ReferenceDriverTypeWhat it requiresStatusAttached to
DCWW100301a · a7ef2bd9W_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
LOWER CORRIS STW
Complete 2025-26Corris WwTW Storm Overflow
DCWW100302a · 28cda74aW_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
MACHYNLLETH STW
Complete 2025-26Machynlleth WwTW Inlet Storm Overflow
DCWW102221a · d804eea2W_U_O_INV1Investigation
Investigation to classify a storm overflow in ''high priority locations'' in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
ABERDYFI
Due 2026-27Aberdyfi Storm Overflow
DCWW100204a · 96846e80W_U_MON4Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation at WwTW or last in line Sewage Pumping Station overflows
WQ
ESGAIRGEILIOG CEINWS
Due 2026-27Ceinws Esgairgeiliog Storm Overflow
DCWW100635a · ee31d24fW_U_IMP5Improvement
Increasing Flow Passed Forward (FPF) flow at WwTW’s that were identified in PR19 as having low permitted FPF / DWF (Dry Weather Flow) ratios and were subsequently deferred until PR24 with the written agreement of NRW
WQ
MACHYNLLETH
Due 2027-28Machynlleth WwTW Inlet Storm Overflow
DCWW101582a · a21c0437W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Aberangell No1 PS
Due 2029-30Afon Angell Bridge Aberangell Storm Overflow
DCWW101234a · 15f92b57W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
ABERANGELL NO1 PS, NR 2 WALTON TERR, ABERANGELL, MACHYNLLETH
Due 2029-30Afon Angell Bridge Aberangell Storm Overflow
DCWW101283a · c15e0718W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
ABERDYFI WHARF SEWAGE PUMPING STATION
Due 2029-30Aberdyfi Storm Overflow
DCWW101988a · 8e9ec2baW_U_O_IMP1Improvement
Action to implement improvements to overflows classified as Unsatisfactory
WQ
CEINWS ESGAIRGEILIOG
Due 2029-30Ceinws Esgairgeiliog Storm Overflow
DCWW101149a · a9617642W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
CEMAES PS
Due 2029-30Water body only
DCWW101156a · 332fe30eW_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
COMMINS COCH SEWAGE PUMPING STATION, COMMINS COCH
Due 2029-30Commins Coch Storm Overflow
DCWW101148a · 884623daW_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
CWM LLINAU PS
Due 2029-30Water body only
DCWW101549a · 9f6163d4W_FISH_IMP1Improvement
Implementation of actions to prevent or mitigate causes of entrainment or impediment to fish passage. Including removal of assets or deliver / install / construct fish passage solutions at sites where water company assets have been identified to impede fish passage, to include sites where their assets are the barrier in it’s entirety, or where their asset forms part of the barrier preventing or restricting fish passage. This includes both up and downstream fish passage.
Fish
Fish Barrier Mitigation at asset 50534797
Due 2029-30Water body only
DCWW102790a · eb311f06W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
GARSIWN DITCH
Due 2029-30Garsiwn Ditch Storm Overflow
DCWW102458a · ad6ced79W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
LLAN-LLANBRYNMAIR PS
Due 2029-30Bontdolgadfan Storm Overflow
DCWW101150a · 01dc4ba2W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
LLANWRIN PS MACHYNLLETH
Due 2029-30Water body only
DCWW101582a · d7b7b280W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Machynlleth - Doll Street CSO
Due 2029-30Heol Y Doll Machynlleth Storm Overflow
DCWW101153a · da42adfcW_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
MACHYNLLETH SEWAGE TREATMENT WORKS
Due 2029-30Machynlleth WwTW Inlet Storm Overflow
DCWW101582a · 70f193c6W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
MACHYNLLETH STW CSO
Due 2029-30Machynlleth WwTW Settled Storm Overflow
DCWW101582a · 91889633W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Minffordd St CSO, Corris
Due 2029-30Minffordd Street Corris Storm Overflow
DCWW101216a · 000cd550W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
PENEGOES PUMPING STATION
Due 2029-30Water body only
DCWW102531a · 520915d8W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
TALYBONT (NE OF ABERYSTWYTH) PS
Due 2029-30Talybont Overflow
DCWW101252a · 16689ff1W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
YNYSLAS PUMPING STATION
Due 2029-30East of Ynyslas Beach Overflow
DCWW102608a · 21a851eeW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
YNYSLAS SPS
Due 2029-30East of Ynyslas Beach Overflow

24 of 24 measures shown. A measure whose completion date has passed is shown as Complete; the water company's actual delivery against it is reported to the regulator but not published here.

There is no public change log

NRW publishes the NEP as an open map layer, but there is no versioned public comparison or published reasons when a measure is re-dated or dropped. The only way to hold slippage to account is to archive every annual release and diff it yourself.

The 2027 pressure point

Most investigations must complete by 30 April 2027 to feed the 2030–35 programme. That date — not 2030 — is the one to hold: an investigation that slips past it cannot shape the next round of funded schemes.