Who is fixing it

What the regulator requires

A measure is a specific action the regulator requires the water company to take at a named site — to investigate a problem, keep monitoring it, or physically fix it — each with a completion date. These are the legally binding measures on record for this catchment: what each requires, and what to watch.

These measures are legally binding. Each one is a dated, site-specific requirement the company must deliver.

The National Environment Programme is how Natural Resources Wales turns statutory duties into named obligations at named sites, with a completion date attached. Where a measure requires a physical upgrade, NRW writes the result into the site's environmental permit — and from that point the requirement is criminally enforceable.

The measure itself is public. What is not published is the water company's action to comply with it — its delivery is reported to the regulator and scored, but the underlying work, and whether a measure has actually resolved the problem on the ground, is not on the public record. What to watch is slippage: a measure can be re-dated or re-scoped, and until the permit is varied the obligation has not changed.

What the types mean

Improvement

A physical upgrade — bigger storage, better treatment, more capacity. This is the only type that actually fixes the problem on the ground.

Investigation

A study of the cause. It produces a report, not a repair — an investigation must lead to an improvement before anything changes.

Monitoring

Installing or running instruments to measure the problem. Necessary evidence, but on its own it fixes nothing — it too has to be followed by an improvement.

So an overflow whose only measures are investigations or monitoring is being looked at, not yet fixed. On the gaps page, only a measure that is still active counts as action — a measure completed while the overflow is still failing does not.

62
Measures in this catchment
NEP, current record
60
Still active
not yet past their date
2
Assumed complete
completion date has passed
3
Are physical improvements
the rest investigate or monitor
ReferenceDriverTypeWhat it requiresStatusAttached to
DCWW100163a · 527c5036W_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
CILFYNYDD STW CILFYNYDD PONTYPRID
Complete 2025-26Cilfynydd WwTW Storm Overflow
DCWW100190a · beef8c44W_U_MON3Monitoring
MCERTS certified Flow Passed Forward (FPF) overflow operation monitoring at WwTW or last in line Sewage Pumping Station overflows
WQ
CYNON VALLEY STW GLYNCOCH PONTY
Complete 2025-26Cynon WwTW Storm Overflow
DCWW102160a · d50b8d82W_U_O_INV1Investigation
Investigation to classify a storm overflow in ''high priority locations'' in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
ABERAMAN WIND ST BOTTOM NR L MARDY LODGE
Due 2026-27Wind Street Storm Overflow
DCWW102626a · 3987666eW_U_O_INV1Investigation
Investigation to classify a storm overflow in ''high priority locations'' in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
ABERCWMBOI PARKVIEW CAPCOCH INFANT SCH
Due 2026-27Park View Terrace Storm Overflow
DCWW102162a · 177541c7W_U_O_INV1Investigation
Investigation to classify a storm overflow in ''high priority locations'' in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
ABERCYNON RUGBY CLUB
Due 2026-27Park Road Abercynon Storm Overflow
DCWW102157a · 1c58bf64W_U_O_INV1Investigation
Investigation to classify a storm overflow in ''high priority locations'' in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
CWMBACH CANAL ROAD
Due 2026-27Canal Road Cwmbach Storm Overflow
DCWW102156a · e24412d9W_U_O_INV1Investigation
Investigation to classify a storm overflow in ''high priority locations'' in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
CWMBACH SIDE OF POLICE HOUSE
Due 2026-27Bro Deg Canal Road Junction Storm Overflow
DCWW102627a · b9a9fd7fW_U_O_INV1Investigation
Investigation to classify a storm overflow in ''high priority locations'' in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
CWMBACH SION TERRACE NO 11
Due 2026-27Sion Terrace Storm Overflow
DCWW102158a · 6d4428f1W_U_O_INV1Investigation
Investigation to classify a storm overflow in ''high priority locations'' in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
MOUNTAIN ASH CWMPENNAR VORTEX ADJ LOW RO
Due 2026-27Low Row Cwmpennar Storm Overflow
DCWW102150a · 2151f6f3W_U_O_INV1Investigation
Investigation to classify a storm overflow in ''high priority locations'' in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
PENRHIWCEIBER POINT D CSO
Due 2026-27Penrhiwceiber Point D Storm Overflow
DCWW101507a · 3e71442cW_FISH_IMP1Improvement
Implementation of actions to prevent or mitigate causes of entrainment or impediment to fish passage. Including removal of assets or deliver / install / construct fish passage solutions at sites where water company assets have been identified to impede fish passage, to include sites where their assets are the barrier in it’s entirety, or where their asset forms part of the barrier preventing or restricting fish passage. This includes both up and downstream fish passage.
Fish
50395402 (Bailey Street)
Due 2029-30Water body only
DCWW101552a · 4f369b64W_FISH_IMP1Improvement
Implementation of actions to prevent or mitigate causes of entrainment or impediment to fish passage. Including removal of assets or deliver / install / construct fish passage solutions at sites where water company assets have been identified to impede fish passage, to include sites where their assets are the barrier in it’s entirety, or where their asset forms part of the barrier preventing or restricting fish passage. This includes both up and downstream fish passage.
Fish
50412262 (MerthyrRoadPipes)
Due 2029-30Water body only
DCWW101582a · 950aa48fW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
A CSO AT FIELD ADJACENT TO DAVID ST
Due 2029-30Dare Road Storm Overflow
DCWW102300a · 8e922fefW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
ABERAMAN CARDIFF ROAD NO 104
Due 2029-30Cardiff Road Aberaman Storm Overflow
DCWW102266a · 730f29e2W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
ABERAMAN CURRE STREET BOTTOM END OF
Due 2029-30Aberaman Curre Street Storm Overflow
DCWW101582a · f2557748W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Aberaman Cynon St rear of
Due 2029-30Cynon Street Storm Overflow
DCWW102670a · 6f1f9e63W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
ABERAMAN INCLINE ROW ALONGSIDE REAR OF
Due 2029-30Foundry View Aberaman No 2 Storm Overflow
DCWW101582a · ce97d32aW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Aberaman Park Industrial Estate CSO, Aberdare
Due 2029-30Nr Aberaman Park Ind. Est. Storm Overflow
DCWW102299a · 2db91f1fW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
ABERAMAN WYNDHAM CRESCENT O/S POLICE STN
Due 2029-30Cynon Street Storm Overflow
DCWW100826a · 9f477aa6W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
ABERCYNON PUMPING STATION, WOOD ROAD, ABERCYNON
Due 2029-30Martins Terrace Abercynon Overflow
DCWW102310a · 396d687dW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
ABERDARE ABERAMAN RUGBY CLUB
Due 2029-30Commercial Street Aberdare Overflow
DCWW101582a · cf40035dW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
ABERDARE FORECOURT CSO LLWYDCOED
Due 2029-30Maes Y Ffion Storm Overflow
DCWW102265a · 2d8ed055W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
ABERDARE FORGE TRIP NO 10
Due 2029-30Abernant Road Aberdare Storm Overflow
DCWW102298a · b29187d0W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
CLYDACH ROAD , YNYSYBWL
Due 2029-30Clydach Road Ynysybwl Storm Overflow
DCWW101582a · aa7820acW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Cribbyn-Ddu Street Junction CSO
Due 2029-30Glynmynach Street Storm Overflow
DCWW101582a · e545fe5bW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
CSO ABERAMAN IND EST ABERAMAN
Due 2029-30Aberaman Park West Storm Overflow
DCWW101582a · dcf02939W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
CSO at Cwmbach Bryngolwg No 45
Due 2029-30Bryngolwg Storm Overflow
DCWW101582a · f62a7d39W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
CSO AT BOTTOM MONK STREET (Station St Aberdare)
Due 2029-30Station Street Aberdare Storm Overflow
DCWW101582a · f7012cb5W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
CSO at HIRWAUN - ON TRAMWAY
Due 2029-30Hirwaun Tramway Storm Overflow
DCWW101582a · f5785054W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
CSO at Hirwaun Trenant No70 Rear of Garden
Due 2029-30Trenant 1 Storm Overflow
DCWW101582a · c30c252aW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
CSO at Junction of David St & Pant Rd, Aberaman
Due 2029-30David Street Aberaman Storm Overflow
DCWW101582a · fad1fe61W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
CSO at No20 Glancynon Terrace, Aberaman
Due 2029-30Glancynon Terrace Storm Overflow
DCWW101582a · 215a51d9W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
CSO at Rear of No12 Bonhaul, Cwmbach
Due 2029-30Bron Haul Storm Overflow
DCWW101582a · 4a1e27aaW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
CSO at West Bank Of River South Of A455 Br
Due 2029-30Merthyr Road Bridge Storm Overflow
DCWW101582a · dbf9daaeW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
CSO Off Glan Road (St John the Baptist Church)
Due 2029-30Glan Road Storm Overflow
DCWW101582a · c72c7301W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Cwmbach CSO - Outside Bro Deg
Due 2029-30Bro Deg 2 Storm Overflow
DCWW100786a · e1b7a2f6W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
CWMBACH SEWAGE PUMPING STATION, CANAL ROAD, CWMBACH, CYNON VALLEY
Due 2029-30Cwmbach Storm Overflow
DCWW102539a · 178621ffW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Cynon Terrace CSO, Penrhiwceiber
Due 2029-30Cynon Terrace Penrhiwceiber Overflow
DCWW101582a · ce1afd82W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Duffryn Rd Mount 2 CSO
Due 2029-30Duffryn Road Mountain Ash Overflow
DCWW101582a · 343ca68bW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Elizabeth St CSO
Due 2029-30Elizabeth Street Storm Overflow
DCWW101582a · f3043492W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Fforchaman Street CSO
Due 2029-30Fforchaman Road Cwmaman
DCWW102264a · 55f4b51fW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
GADLYS TUDOR TERRACE NOS 23/24 R/O
Due 2029-30Tudor Terrace Rear Storm Overflow
DCWW101582a · 87e26c39W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
GLYN STREET CSO GLYN ST YNYSYBWL
Due 2029-30Glynmynach Street Storm Overflow
DCWW100735a · 71a19729W_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
GROVERS FIELD DEVELOPMENT YNYSYBWL
Due 2029-30Water body only
DCWW102296a · 6f610be6W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Hirwaun, 1 Bute Place
Due 2029-30Bute Place Hirwaun Storm Overflow
DCWW101582a · 1b780acbW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Maesygwartha SPS and CSO
Due 2029-30Glynmynach Street Storm Overflow
DCWW101582a · 95770648W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
NEWTOWN COMMUNITY HALL CSO
Due 2029-30Miskin Road Railway Storm Overflow
DCWW101582a · 1c5089c9W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
No 1 Wellington St CSO, Robertstown
Due 2029-30Wellington St No1 Storm overflow
DCWW101582a · 09f48bd6W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
No 10 Hamilton St CSO, Mountain Ash
Due 2029-30Hamilton Street Storm Overflow
DCWW101582a · ce9fccf1W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
No. 29 Maeshyfryd CSO, Cwmbach
Due 2029-30Cwmbach Maeshyfryd Stoem Overflow
DCWW101582a · 2af69743W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Old Parish Road CSO, Ynysbwl
Due 2029-30Old Parish Road Storm Overflow
DCWW101582a · fc037e95W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Pant-Y-Cerdin CSO, Aberdare
Due 2029-30Pant-Y-Cerdin Storm Overflow
DCWW101582a · 9dec819cW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
PONTCYNON PIPE BRIDGE CSO ABERCYNON
Due 2029-30Pontcynon Pipe Bridge Storm Overflow
DCWW101582a · 50ad2f7eW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Rocky Rd CSO Merthyr Tydfil
Due 2029-30Duffryn Road Mountain Ash Overflow
DCWW100810a · 79c3317dW_U_MON6Monitoring
MCERTS certified monitoring (EDM event duration monitor) of emergency overflow operation on network pumping stations
WQ
SPS serving res. Dev UPPER ABERNANT
Due 2029-30Water body only
DCWW101582a · dbb64c66W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Station Terrace CSO, Penrhiwceiber
Due 2029-30Penrhiwceiber Station Storm Overflow
DCWW102543a · 136c6c04W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Tan Y Bryn Gardens, Llwydcoed
Due 2029-30Tan Y Bryn Gardens Llwydcoed Overflow
DCWW101582a · 674614d4W_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
Tank Near Pit CSO Ynysybwl
Due 2029-30Robert Street Storm Overflow
DCWW101582a · e46edd1aW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
TOWN HALL
Due 2029-30Cardiff Road Mountain Ash Storm Overflow
DCWW102669a · 142463cfW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
TRECYNON HARRIET STREET IN LANE R/O
Due 2029-30Trecynon Harriet Street Storm Overflow
DCWW101933a · f6d09141W_U_O_IMP1Improvement
Action to implement improvements to overflows classified as Unsatisfactory
WQ
Trecynon Mill St 46/47 Tanks Meirion St
Due 2029-30Meirion Street Roundabout Trecynon Storm Overflow
DCWW102362a · 4c826debW_U_O_INV1Investigation
Investigation to classify a storm overflow in accordance with NRW’s storm overflow classification guidance where assessment of the asset has not previously been captured by other programmes
WQ
YNYSYBWL O/S 2 CLYDACH TERRACE CSO
Due 2029-30Clydach Road Ynysybwl Storm Overflow

62 of 62 measures shown. A measure whose completion date has passed is shown as Complete; the water company's actual delivery against it is reported to the regulator but not published here.

There is no public change log

NRW publishes the NEP as an open map layer, but there is no versioned public comparison or published reasons when a measure is re-dated or dropped. The only way to hold slippage to account is to archive every annual release and diff it yourself.

The 2027 pressure point

Most investigations must complete by 30 April 2027 to feed the 2030–35 programme. That date — not 2030 — is the one to hold: an investigation that slips past it cannot shape the next round of funded schemes.