← Hellingly, - 108247

Spill evidence · River Hub

Hellingly, - 108247

Pumping station overflow · SWS00447 · feeds HAILSHAM NORTH STW
Dry spill

Evidence strength

Medium confidence
  • ✓ Dry across a 4-day antecedent window
  • ✓ Rain gauge close (≤5 km)
  • ⚠ Short discharge (<1 h) — weaker signal

The discharge

Spill day
Friday, 10 April 2026
Started
10 Apr 2026, 12:47
Ended
10 Apr 2026, 13:08
Duration
20 minutes 29 seconds
Receiving water
Cuckmere between Arlington and Lower Horsebridge
Parish
Hellingly

Rainfall evidence

Daily rainfall at the matched gauge (Cowbeech) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Dry spill3-day window: Dry spill4-day window: Dry spill
DateRainfall
10/04/2026 (spill day)0 mmdry
09/04/20260 mmdry
08/04/20260 mmdry
07/04/20260 mmdry
06/04/20260 mmdry

River flow that day: 2.137 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 4.8 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
Unknown (no works overflow data)
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SWS00447). Rainfall: EA Hydrology gauge 92c16f63-5f5b-46d7-9526-8165cf373f46. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Cuckmere Data.