What the regulator requires
A measure is a specific action the regulator requires the water company to take at a named site — to investigate a problem, keep monitoring it, or physically fix it — each with a completion date. These are the legally binding measures on record for this catchment: what each requires, and what to watch.
These measures are legally binding. Each one is a dated, site-specific requirement the company must deliver.
The Water Industry National Environment Programme is how the Environment Agency turns statutory duties into named obligations at named sites, with a completion date attached. Where a measure requires a physical upgrade, the Agency writes the result into the site's environmental permit — and from that point the requirement is criminally enforceable.
The measure itself is public. What is not published is the water company's action to comply with it — its delivery is reported to the regulator and scored, but the underlying work, and whether a measure has actually resolved the problem on the ground, is not on the public record. What to watch is slippage: a measure can be re-dated or re-scoped, and until the permit is varied the obligation has not changed.
What the types mean
A physical upgrade — bigger storage, better treatment, more capacity. This is the only type that actually fixes the problem on the ground.
A study of the cause. It produces a report, not a repair — an investigation must lead to an improvement before anything changes.
Installing or running instruments to measure the problem. Necessary evidence, but on its own it fixes nothing — it too has to be followed by an improvement.
So an overflow whose only measures are investigations or monitoring is being looked at, not yet fixed. On the gaps page, only a measure that is still active counts as action — a measure completed while the overflow is still failing does not.
| Reference | Driver | Type | What it requires | Status | Attached to |
|---|---|---|---|---|---|
| 08SW100161 · a | BW_IMP1 | Improvement | 2 spills 50m3 aggregated BARTON HILL/BRUNSWICK PL_CSO_DAWLISH | Complete 2025-26 | BARTON HILL/BRUNSWICK PL_CSO_DAWLISH |
| 08SW100161 · b | BW_IMP1 | Improvement | 2 spills 50m3 aggregated BROOK HOUSE_CSO_DAWLISH | Complete 2025-26 | BROOK HOUSE_CSO_DAWLISH |
| 08SW100161 · c | BW_IMP1 | Improvement | 2 spills 50m3 aggregated BROOK ST MANOR GARDENS_CSO_DAWLISH | Complete 2025-26 | BROOK ST MANOR GARDENS_CSO_DAWLISH |
| 08SW100161 · e | BW_IMP1 | Improvement | 2 spills 50m3 aggregated PIERMONT PL/JUBILEE BRIDGE_CSO_DAWLISH | Complete 2025-26 | PIERMONT PL/JUBILEE BRIDGE_CSO_DAWLISH |
| 08SW100161 · i | BW_IMP1 | Improvement | 2 spills 50m3 aggregated VIADUCT SPS_PSCSOEO_DAWLISH | Complete 2025-26 | VIADUCT SPS_PSCSOEO_DAWLISH |
| 08SW100161 · j | BW_IMP1 | Improvement | 2 spills 50m3 aggregated WEST CLIFF PK/LAMBETH WK_CSO_DAWLISH | Complete 2025-26 | WEST CLIFF PK/LAMBETH WK_CSO_DAWLISH |
| 08SW104909 · a | U_MON4 | Monitoring | PR24 U_MON4 from U_INV2 investigation (U_MON4c) Cheriton Bishop STW | Due 2026-27 | Ford Brook (Exe) |
| 08SW104908 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) CHERITON FITZPAINE STW | Due 2026-27 | Holly Water |
| 08SW104907 · a | U_MON4 | Monitoring | PR24 U_MON4 from U_INV2 investigation (U_MON4c) CHERITON FITZPAINE STW | Due 2026-27 | Holly Water |
| 08SW104878 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) Crediton STW | Due 2026-27 | Lower Creedy |
| 08SW104877 · a | U_MON4 | Monitoring | Move AMP7 U_INV2 driver output to 2-minute flow monitoring (U_MON4b) Crediton STW | Due 2026-27 | Lower Creedy |
| 08SW104493 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) Kenn & Kennford STW:
Kenn and Kennford Pumping Station | Due 2026-27 | Kenn |
| 08SW104492 · a | U_MON4 | Monitoring | Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a) Kenn & Kennford STW:
Kenn and Kennford Pumping Station | Due 2026-27 | Kenn |
| 08SW104705 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) NEWTON ST CYRES STW | Due 2026-27 | Lower Creedy |
| 08SW104704 · a | U_MON4 | Monitoring | PR24 U_MON4 from U_INV2 investigation (U_MON4c) NEWTON ST CYRES STW | Due 2026-27 | Lower Creedy |
| 08SW104643 · a | U_MON4 | Monitoring | PR24 U_MON4 from U_INV2 investigation (U_MON4c) SANDFORD STW | Due 2026-27 | Middle Creedy |
| 08SW104644 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) SANDFORD STW | Due 2026-27 | Middle Creedy |
| 08SW104577 · a | U_MON4 | Monitoring | Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a) Tedburn St Mary STW | Due 2026-27 | Culvery River |
| 08SW104578 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) Tedburn St Mary STW | Due 2026-27 | Culvery River |
| 08SW104525 · a | U_MON4 | Monitoring | Move AMP7 U_INV2 driver output to 2-minute flow monitoring (U_MON4b) YEOFORD STW | Due 2026-27 | Upper Yeo (Creedy) |
| 08SW104526 · a | U_MON3 | Monitoring | MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a) YEOFORD STW | Due 2026-27 | Upper Yeo (Creedy) |
| 08SW104999 · aj | EnvAct_INV4 | Investigation | Investigation to meet EnvAct INV4 Driver CLIFTON RD/ALBERT RD_CSO_EXETER | Due 2027-28 | CLIFTON RD/ALBERT RD_CSO_EXETER |
| 08SW104999 · ak | EnvAct_INV4 | Investigation | Investigation to meet EnvAct INV4 Driver CLIFTON RD/CHUTE ST_CSO_EXETER | Due 2027-28 | CLIFTON RD/CHUTE ST_CSO_EXETER |
| 08SW104999 · am | EnvAct_INV4 | Investigation | Investigation to meet EnvAct INV4 Driver COLLETON GROVE_CSO_EXETER | Due 2027-28 | COLLETON GROVE_CSO_EXETER |
| 08SW104999 · au | EnvAct_INV4 | Investigation | Investigation to meet EnvAct INV4 Driver DIXS FIELD_CSO_EXETER | Due 2027-28 | DIXS FIELD_CSO_EXETER |
| 08SW104999 · bb | EnvAct_INV4 | Investigation | Investigation to meet EnvAct INV4 Driver EXETER BOWLING CLUB_CSO_EXETER | Due 2027-28 | EXETER BOWLING CLUB_CSO_EXETER |
| 08SW104999 · bu | EnvAct_INV4 | Investigation | Investigation to meet EnvAct INV4 Driver HOLLOWAY ST_CSO_EXETER | Due 2027-28 | HOLLOWAY ST_CSO_EXETER |
| 08SW104999 · by | EnvAct_INV4 | Investigation | Investigation to meet EnvAct INV4 Driver LARKBEARE HSE_CSO_EXETER | Due 2027-28 | LARKBEARE HSE_CSO_EXETER |
| 08SW104999 · ca | EnvAct_INV4 | Investigation | Investigation to meet EnvAct INV4 Driver LORDS MEADOW STW_SO_CREDITON | Due 2027-28 | LORDS MEADOW STW_SO_CREDITON |
| 08SW104999 · cb | EnvAct_INV4 | Investigation | Investigation to meet EnvAct INV4 Driver LORDS MEADOW STW_SSO_CREDITON | Due 2027-28 | LORDS MEADOW STW_SSO_CREDITON |
| 08SW104999 · cf | EnvAct_INV4 | Investigation | Investigation to meet EnvAct INV4 Driver MAGDALEN RD_CSO_EXETER | Due 2027-28 | MAGDALEN RD_CSO_EXETER |
| 08SW104999 · cs | EnvAct_INV4 | Investigation | Investigation to meet EnvAct INV4 Driver NEWTON ST CYRES STW_SO_NEWTON ST CYRES | Due 2027-28 | NEWTON ST CYRES STW_SO_NEWTON ST CYRES |
| 08SW104999 · db | EnvAct_INV4 | Investigation | Investigation to meet EnvAct INV4 Driver PARIS STREET_CSO_EXETER | Due 2027-28 | PARIS STREET_CSO_EXETER |
| 08SW100187 · a | WFD_INV | Investigation | *Holding Line* investigation to inform potential requirements for AMP9 POUGHILL STW | Due 2027-28 | Holly Water |
| 08SW104999 · ep | EnvAct_INV4 | Investigation | Investigation to meet EnvAct INV4 Driver TEMPLE RD_CSO_EXETER | Due 2027-28 | TEMPLE RD_CSO_EXETER |
| 08SW101449 · a | EnvAct_IMP2 | Improvement | Reduction of spills to meet EnvAct_IMP drivers CLIFTON RD/ALBERT RD_CSO_EXETER | Due 2029-30 | CLIFTON RD/ALBERT RD_CSO_EXETER |
| 08SW101450 · a | EnvAct_IMP2 | Improvement | Reduction of spills to meet EnvAct_IMP drivers CLIFTON RD/CHUTE ST_CSO_EXETER | Due 2029-30 | CLIFTON RD/CHUTE ST_CSO_EXETER |
| 08SW101453 · a | EnvAct_IMP2 | Improvement | Reduction of spills to meet EnvAct_IMP drivers COLLETON GROVE_CSO_EXETER | Due 2029-30 | COLLETON GROVE_CSO_EXETER |
| 08SW102874 · a | INNS_ND | No deterioration | Action related to crayfish survival. Multi-AMP scheme - to continue through AMP8/9 Creedy catchment crayfish | Due 2029-30 | Lower Yeo (Creedy) |
| 08SW101468 · a | EnvAct_IMP2 | Improvement | Reduction of spills to meet EnvAct_IMP drivers DIXS FIELD_CSO_EXETER | Due 2029-30 | DIXS FIELD_CSO_EXETER |
| 08SW101477 · a | EnvAct_IMP2 | Improvement | Reduction of spills to meet EnvAct_IMP drivers EXETER BOWLING CLUB_CSO_EXETER | Due 2029-30 | EXETER BOWLING CLUB_CSO_EXETER |
| 08SW101539 · a | EnvAct_IMP2 | Improvement | Reduction of spills to meet EnvAct_IMP drivers MAGDALEN RD_CSO_EXETER | Due 2029-30 | MAGDALEN RD_CSO_EXETER |
| 08SW101578 · a | EnvAct_IMP2 | Improvement | Reduction of spills to meet EnvAct_IMP drivers PARIS STREET_CSO_EXETER | Due 2029-30 | PARIS STREET_CSO_EXETER |
| 08SW101632 · a | EnvAct_IMP2 | Improvement | Reduction of spills to meet EnvAct_IMP drivers TEMPLE RD_CSO_EXETER | Due 2029-30 | TEMPLE RD_CSO_EXETER |
| 08SW102113 · v | U_IMP1 | Improvement | Improve discharge from agglomeration that has crossed 250 and has envirronmental imapct SHILLINGFORD ST GEORGE_STW_SHILLINGFORD | Due 2030-31 | Matford Brook |
45 of 45 measures shown. A measure whose completion date has passed is shown as Complete; the water company's actual delivery against it is reported to the regulator but not published here.
There is no public change log
The live WINEP spreadsheet is internal, and there is no versioned public comparison or published reasons when a measure is re-dated or dropped. The only way to hold slippage to account is to archive every annual release and diff it yourself.
The 2027 pressure point
Most investigations must complete by 30 April 2027 to feed the 2030–35 programme. That date — not 2030 — is the one to hold: an investigation that slips past it cannot shape the next round of funded schemes.