← Church St, Crediton
Spill evidence · River Hub
Church St, Crediton
Combined sewer overflow · SBB00266 · feeds CREDITON STW
No rain data
The discharge
- Spill day
- Monday, 24 February 2020
- Started
- 24 Feb 2020, 11:30
- Ended
- 24 Feb 2020, 11:44
- Duration
- 14 minutes 59 seconds
- Receiving water
- Middle Creedy
- Parish
- Crediton
Rainfall evidence
Daily rainfall at the matched gauge (Crediton Knowle) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.
1-day window: No rain data3-day window: No rain data4-day window: No rain data
| Date | Rainfall | |
|---|---|---|
| 24/02/2020 (spill day) | no data | |
| 23/02/2020 | no data | |
| 22/02/2020 | no data | |
| 21/02/2020 | no data | |
| 20/02/2020 | no data |
River flow that day: 16.012 m³/s. Verify at the EA rainfall station.
Gauge proximity
Outlet (red) vs matched rain gauge (blue), 6.9 km apart. Closer means the rainfall reading is more representative of the overflow.
Loading map…
Severity & context
- Bathing water
- Not Applicable
- Shellfish water
- Not Applicable
- Ahead of the works
- Yes — the treatment works' own overflow stayed shut that day, so capacity was available. Avoidable.
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SBB00266). Rainfall: EA Hydrology gauge d891e8a2-b9ce-4f71-a67a-70ce70350350. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Creedy Data.