← Gerrards Cross STW

Spill evidence · River Hub

Gerrards Cross STW

Storm overflow at the works · TWL00196 · feeds GERRARDS CROSS, GERRARDS CROSS, STW"
Dry spill

Evidence strength

Low confidence
  • ✓ Sustained discharge (≥1 h)
  • ✓ Dry on the EA 1-day window

The discharge

Spill day
Wednesday, 24 June 2026
Started
24 Jun 2026, 02:45
Ended
24 Jun 2026, 03:45
Duration
1 hour
Receiving water
Misbourne
Parish
Denham

Rainfall evidence

Daily rainfall at the matched gauge (Raf Northolt) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Dry spill3-day window: Wet weather4-day window: Wet weather
DateRainfall
24/06/2026 (spill day)0 mmdry
23/06/20260 mmdry
22/06/202629.8 mmrain
21/06/20260 mmdry
20/06/20260 mmdry

River flow that day: 0.787 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 8.5 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet TWL00196). Rainfall: EA Hydrology gauge 62a067ad-54c1-4a8c-bf8a-446cbbcc7e2e. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Colne Data.