← Gerrards Cross STW

Spill evidence · River Hub

Gerrards Cross STW

Storm overflow at the works · TWL00196 · feeds GERRARDS CROSS, GERRARDS CROSS, STW"
Wet weather

The discharge

Spill day
Sunday, 22 September 2024
Started
22 Sept 2024, 23:45
Ended
9 Oct 2024, 11:45
Duration
16 days 12 hours
Receiving water
Misbourne
Parish
Denham

Rainfall evidence

Daily rainfall at the matched gauge (Raf Northolt) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
22/09/2024 (spill day)48.6 mmrain
21/09/202411.2 mmrain
20/09/20240 mmdry
19/09/20240 mmdry
18/09/20240 mmdry

River flow that day: 2.315 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 8.5 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
EA annual return (2024)
144 counted spills · 2838 h total
Monitor uptime (2024)
100% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet TWL00196). Rainfall: EA Hydrology gauge 62a067ad-54c1-4a8c-bf8a-446cbbcc7e2e. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Colne Data.
Spill evidence — Gerrards Cross STW — River Colne Data