← Bletchingdon STW

Spill evidence · River Hub

Bletchingdon STW

Storm overflow at the works · TWL00043 · feeds BLETCHINGDON STW
Dry spill

Evidence strength

Medium confidence
  • ✓ Long discharge (≥6 h)
  • ✓ Dry on the EA 1-day window
  • ✓ Monitor 99% operational that year

The discharge

Spill day
Thursday, 28 November 2024
Started
28 Nov 2024, 07:00
Ended
29 Nov 2024, 01:30
Duration
18 hours 30 minutes
Receiving water
Cherwell (Bletchingdon to Ray)
Parish
Bletchingdon

Rainfall evidence

Daily rainfall at the matched gauge (Bicester) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Dry spill3-day window: Wet weather4-day window: Wet weather
DateRainfall
28/11/2024 (spill day)0.08 mmdry
27/11/20240.02 mmdry
26/11/20249.32 mmrain
25/11/20240.24 mmdry
24/11/202426.37 mmrain

River flow that day: 14.719 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 8.2 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
EA annual return (2024)
120 counted spills · 1871 h total
Monitor uptime (2024)
99% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet TWL00043). Rainfall: EA Hydrology gauge 5466e4ec-fcb6-47f5-bb1f-fd1a54e108da. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Cherwell Data.
Spill evidence — Bletchingdon STW — River Cherwell Data