← Nanstallon STW, Bodmin

Spill evidence · River Hub

Nanstallon STW, Bodmin

Storm overflow at the works · SBB00126 · feeds BODMIN (NANSTALLON) STW
No rain data

The discharge

Spill day
Wednesday, 10 June 2020
Started
10 Jun 2020, 23:56
Ended
11 Jun 2020, 14:20
Duration
14 hours 23 minutes
Receiving water
Lower River Camel
Parish
Lanivet

Rainfall evidence

Daily rainfall at the matched gauge (Bodmin Callywith) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: No rain data3-day window: No rain data4-day window: No rain data
DateRainfall
10/06/2020 (spill day)no data
09/06/2020no data
08/06/2020no data
07/06/2020no data
06/06/2020no data

River flow that day: 1.652 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 4.2 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Camel Estuary
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SBB00126). Rainfall: EA Hydrology gauge 65e770aa-72b5-4df7-8e24-23655a7e1cf5. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Camel Data.