← Blowing Hse Ln, Bodmin

Spill evidence · River Hub

Blowing Hse Ln, Bodmin

Combined sewer overflow · SBB00121 · feeds BODMIN (NANSTALLON) STW
Wet weather

The discharge

Spill day
Sunday, 26 January 2025
Started
26 Jan 2025, 10:00
Ended
26 Jan 2025, 10:15
Duration
15 minutes
Receiving water
St Lawrence Stream
Parish
Lanivet

Rainfall evidence

Daily rainfall at the matched gauge (Bodmin Callywith) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
26/01/2025 (spill day)31.7 mmrain
25/01/20255.8 mmrain
24/01/20252.1 mmrain
23/01/202530.4 mmrain
22/01/20251.1 mmrain

River flow that day: 45.11 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 3.8 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Camel Estuary
Ahead of the works
No — the works was also overflowing that day.
EA annual return (2025)
23 counted spills · 19 h total
Monitor uptime (2025)
99% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet SBB00121). Rainfall: EA Hydrology gauge 65e770aa-72b5-4df7-8e24-23655a7e1cf5. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Camel Data.