Who is fixing it

What the regulator requires

A measure is a specific action the regulator requires the water company to take at a named site — to investigate a problem, keep monitoring it, or physically fix it — each with a completion date. These are the legally binding measures on record for this catchment: what each requires, and what to watch.

These measures are legally binding. Each one is a dated, site-specific requirement the company must deliver.

The Water Industry National Environment Programme is how the Environment Agency turns statutory duties into named obligations at named sites, with a completion date attached. Where a measure requires a physical upgrade, the Agency writes the result into the site's environmental permit — and from that point the requirement is criminally enforceable.

The measure itself is public. What is not published is the water company's action to comply with it — its delivery is reported to the regulator and scored, but the underlying work, and whether a measure has actually resolved the problem on the ground, is not on the public record. What to watch is slippage: a measure can be re-dated or re-scoped, and until the permit is varied the obligation has not changed.

What the types mean

Improvement

A physical upgrade — bigger storage, better treatment, more capacity. This is the only type that actually fixes the problem on the ground.

Investigation

A study of the cause. It produces a report, not a repair — an investigation must lead to an improvement before anything changes.

Monitoring

Installing or running instruments to measure the problem. Necessary evidence, but on its own it fixes nothing — it too has to be followed by an improvement.

So an overflow whose only measures are investigations or monitoring is being looked at, not yet fixed. On the gaps page, only a measure that is still active counts as action — a measure completed while the overflow is still failing does not.

73
Measures in this catchment
WINEP, current record
73
Still active
not yet past their date
0
Assumed complete
completion date has passed
18
Are physical improvements
the rest investigate or monitor
ReferenceDriverTypeWhat it requiresStatusAttached to
08WW100875 · aU_MON4Monitoring
MCERTS certified Flow passed forward flow monitor (U_MON4e)
ALFORD WRC flow monitoring
Due 2026-27Brue - R. Alham to Tootle Bridge
08WW100854 · aU_MON3Monitoring
MCERTS certified overflow operation monitor (U_MON3b)
ALFORD WRC overflow monitoring
Due 2026-27Brue - R. Alham to Tootle Bridge
08WW100650 · aU_MON4Monitoring
Move AMP7 U_INV2 driver output to 2-minute flow monitoring (U_MON4b)
Bruton WRC Flow Monitoring
Due 2026-27Brue - Upper
08WW100423 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
Bruton WRC Overflow Monitoring
Due 2026-27Brue - Upper
08WW100653 · aU_MON4Monitoring
PR24 U_MON4 from U_INV2 investigation (U_MON4c)
Butleigh WRC Flow Monitoring
Due 2026-27Brue - Tootle Bridge to Clyse Hole
08WW100427 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
Butleigh WRC Overflow Monitoring
Due 2026-27Brue - Tootle Bridge to Clyse Hole
08WW100662 · aU_MON4Monitoring
PR24 U_MON4 from U_INV2 investigation (U_MON4c)
Cheddar WRC Flow Monitoring
Due 2026-27Cheddar Yeo - source to conf Stubbingham Rhyne
08WW100436 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
Cheddar WRC Overflow Monitoring
Due 2026-27Cheddar Yeo - source to conf Stubbingham Rhyne
08WW100682 · aU_MON4Monitoring
PR24 U_MON4 from U_INV2 investigation (U_MON4c)
Croscombe WRC Flow Monitoring
Due 2026-27Sheppey
08WW100456 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
Croscombe WRC Overflow Monitoring
Due 2026-27Sheppey
08WW100687 · aU_MON4Monitoring
Move AMP7 U_INV2 driver output to 2-minute flow monitoring (U_MON4b)
Ditcheat WRC Flow Monitoring
Due 2026-27Alham
08WW100461 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
Ditcheat WRC Overflow Monitoring
Due 2026-27Alham
08WW100693 · aU_MON4Monitoring
Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a)
Draycott WRC Flow Monitoring
Due 2026-27Axe - Cocklake to Brean Cross Sluice
08WW100467 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
Draycott WRC Overflow Monitoring
Due 2026-27Axe - Cocklake to Brean Cross Sluice
08WW100699 · aU_MON4Monitoring
PR24 U_MON4 from U_INV2 investigation (U_MON4c)
Evercreech WRC Flow Monitoring
Due 2026-27Alham
08WW100473 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
Evercreech WRC Overflow Monitoring
Due 2026-27Alham
08WW100709 · aU_MON4Monitoring
Move AMP7 U_MON4 driver output to 2-minute flow monitoring (U_MON4a)
Glastonbury WRC Flow Monitoring
Due 2026-27GLASTONBURY THE BECKERY STORM TANK
08WW100483 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
Glastonbury WRC Overflow Monitoring
Due 2026-27GLASTONBURY THE BECKERY STORM TANK
08WW100886 · aU_MON4Monitoring
MCERTS certified Flow passed forward flow monitor (U_MON4e)
LOXTON WRC flow monitoring
Due 2026-27Lox Yeo - source to conf Rive Axe
08WW100864 · aU_MON3Monitoring
MCERTS certified overflow operation monitor (U_MON3b)
LOXTON WRC overflow monitoring
Due 2026-27Lox Yeo - source to conf Rive Axe
08WW100750 · aU_MON4Monitoring
PR24 U_MON4 from U_INV2 investigation (U_MON4c)
Meare WRC Flow Monitoring
Due 2026-27Brue - Clyce Hole to conf North Drain
08WW100522 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
Meare WRC Overflow Monitoring
Due 2026-27Brue - Clyce Hole to conf North Drain
08WW100889 · aU_MON4Monitoring
MCERTS certified Flow passed forward flow monitor (U_MON4e)
PARBROOK WRC flow monitoring
Due 2026-27Coxbridge Brook( Brue)
08WW100867 · aU_MON3Monitoring
MCERTS certified overflow operation monitor (U_MON3b)
PARBROOK WRC overflow monitoring
Due 2026-27Coxbridge Brook( Brue)
08WW100769 · aU_MON4Monitoring
PR24 U_MON4 from U_INV2 investigation (U_MON4c)
Pilton WRC Flow Monitoring
Due 2026-27Whitelake
08WW100541 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
Pilton WRC Overflow Monitoring
Due 2026-27Whitelake
08WW100788 · aU_MON4Monitoring
Move AMP7 U_INV2 driver output to 2-minute flow monitoring (U_MON4b)
Shepton Mallet WRC Flow Monitoring
Due 2026-27Sheppey
08WW100561 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
Shepton Mallet WRC Overflow Monitoring
Due 2026-27Sheppey
08WW100040 · aWFD_NDINV_WRFlowInvestigation
Investigate implication of using licence that has not been used for at least 4 years.
Unused licence investigation - Pitcombe spring
Due 2026-27Pitt
08WW100825 · aU_MON4Monitoring
Move AMP7 U_INV2 driver output to 2-minute flow monitoring (U_MON4b)
Wedmore WRC Flow Monitoring
Due 2026-27Axe - Cocklake to Brean Cross Sluice
08WW100599 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
Wedmore WRC Overflow Monitoring
Due 2026-27Axe - Cocklake to Brean Cross Sluice
08WW100828 · aU_MON4Monitoring
PR24 U_MON4 from U_INV2 investigation (U_MON4c)
Wells WRC Flow Monitoring
Due 2026-27Keward Brook
08WW100602 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
Wells WRC Overflow Monitoring
Due 2026-27Keward Brook
08WW100839 · aU_MON4Monitoring
Move AMP7 U_INV2 driver output to 2-minute flow monitoring (U_MON4b)
Winscombe WRC Flow Monitoring
Due 2026-27Lox Yeo - source to conf Rive Axe
08WW100613 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
Winscombe WRC Overflow Monitoring
Due 2026-27Lox Yeo - source to conf Rive Axe
08WW100843 · aU_MON4Monitoring
Move AMP7 U_INV2 driver output to 2-minute flow monitoring (U_MON4b)
Wookey WRC Flow Monitoring
Due 2026-27Axe - source to Cocklake
08WW100617 · aU_MON3Monitoring
MCERTS certification of an AMP7 U_MON3 driver output overflow operation monitor (U_MON3a)
Wookey WRC Overflow Monitoring
Due 2026-27Axe - source to Cocklake
08WW101000 · hcEnvAct_INV4Investigation
Storm overflows - Investigations
***A-WINEP*** GLEN COTTAGE CSO SO Investigation (19723C)
Due 2027-28WSX10135
08WW101000 · fyEnvAct_INV4Investigation
Storm overflows - Investigations
***A-WINEP*** WOOKEY WATER RECYCLING CENTRE SO Investigation (13358B)
Due 2027-28Axe - source to Cocklake
08WW101000 · mjEnvAct_INV4Investigation
Storm overflows - Investigations
BALTONSBOROUGH(MAIN)PUMPING STATION
Due 2027-28Brue - Tootle Bridge to Clyse Hole
08WW101000 · mkEnvAct_INV4Investigation
Storm overflows - Investigations
BARTON ST DAVID PUMPING STATION
Due 2027-28Brue - Tootle Bridge to Clyse Hole
08WW101000 · mlEnvAct_INV4Investigation
Storm overflows - Investigations
BROADMEAD LANE PUMP STATION
Due 2027-28South Drain
08WW101000 · elEnvAct_INV4Investigation
Storm overflows - Investigations
BUTLEIGH SEWAGE TREATMENT WORKS SO Investigation (13043S)
Due 2027-28Brue - Tootle Bridge to Clyse Hole
08WW101000 · ffEnvAct_INV4Investigation
Storm overflows - Investigations
CHEDDAR WASTEWATER TREATMENT WORKS SO Investigation (13057S)
Due 2027-28Cheddar Yeo - source to conf Stubbingham Rhyne
08WW101000 · liEnvAct_INV4Investigation
Storm overflows - Investigations
CHILTON POLDEN PUMPING STATION SO Investigation (14648B)
Due 2027-28South Drain
08WW101000 · jtEnvAct_INV4Investigation
Storm overflows - Investigations
CLIFF STREET/REDCLIFFE STREET CSO SO Investigation (19571C)
Due 2027-28CHEDDAR FROGLANDS
08WW101000 · htEnvAct_INV4Investigation
Storm overflows - Investigations
DITCHEAT WASTEWATER TREATMENT WORKS SO Investigation (13094S)
Due 2027-28Alham
08WW101000 · idEnvAct_INV4Investigation
Storm overflows - Investigations
FROGLANDS PUMPING STATION SO Investigation (14371B)
Due 2027-28Cheddar Yeo - source to conf Stubbingham Rhyne
08WW101000 · hnEnvAct_INV4Investigation
Storm overflows - Investigations
GLASTONBURY WATER RECYCLING CENTRE SO Investigation (13134S)
Due 2027-28GLASTONBURY THE BECKERY STORM TANK
08WW101000 · ejEnvAct_INV4Investigation
Storm overflows - Investigations
MEARE WASTEWATER TREATMENT WORKS SO Investigation (13202S)
Due 2027-28Brue - Clyce Hole to conf North Drain
08WW101000 · jgEnvAct_INV4Investigation
Storm overflows - Investigations
MILL LANE PUMPING STATION SO Investigation (14096B)
Due 2027-28Sheppey
08WW101000 · ixEnvAct_INV4Investigation
Storm overflows - Investigations
PURN PUMPING STATION(WESTON-S-MARE) SO Investigation (15573B)
Due 2027-28Axe - Cocklake to Brean Cross Sluice
08WW101000 · nsEnvAct_INV4Investigation
Storm overflows - Investigations
SHAPWICK PUMPING STATION
Due 2027-28South Drain
08WW101000 · hvEnvAct_INV4Investigation
Storm overflows - Investigations
TOOTLE BRIDGE PUMPING STATION SO Investigation (15316B)
Due 2027-28Brue - Tootle Bridge to Clyse Hole
08WW101000 · fdEnvAct_INV4Investigation
Storm overflows - Investigations
WINSCOMBE WWTW SO Investigation (13351S)
Due 2027-28Lox Yeo - source to conf Rive Axe
08WW101002 · wgEnvAct_IMP4Improvement
Storm overflows - Wetland treatment solution.
BARTON ST DAVID, TOOTAL BRIDGE (Site ID 15316B)
Due 2029-30Brue - Tootle Bridge to Clyse Hole
08WW102035 · aHD_IMP_NNImprovement
Improvements to WRC to achieve tightened phosphorus permit.
Bruton WRC - Phosphorus Removal
Due 2029-30Brue - Upper
08WW101002 · cxEnvAct_IMP2Improvement
EnvAct_IMP4cx. Storm overflows - Frequency improvements
BUTLEIGH SEWAGE TREATMENT WORKS SO improvement (13043S)
Due 2029-30Brue - Tootle Bridge to Clyse Hole
08WW102036 · aHD_IMP_NNImprovement
Improvements to WRC to achieve new phosphorus permit.
Butleigh WRC - Phosphorus Removal
Due 2029-30Brue - Tootle Bridge to Clyse Hole
08WW101002 · drEnvAct_IMP2Improvement
EnvAct_IMP4dr. Storm overflows - Frequency improvements
CHEDDAR WASTEWATER TREATMENT WORKS SO improvement (13057S)
Due 2029-30Cheddar Yeo - source to conf Stubbingham Rhyne
08WW102037 · aWFD_IMPgImprovement
Improvements to WRC to achieve tightened phosphorus permit.
Cheddar WRC - Phosphorus Removal
Due 2029-30Cheddar Yeo - source to conf Stubbingham Rhyne
08WW101002 · peEnvAct_IMP4Improvement
EnvAct_IMP4pe. Storm overflows - Frequency improvements
COTTAGE CSO SO improvement (19723C)
Due 2029-30WSX10135
08WW103014 · aHD_IMPImprovement
Improvements to WRC to achieve new phosphorus permit.
Croscombe WRC - Phosphorus Removal
Due 2029-30Sheppey
08WW102038 · aWFD_IMPgImprovement
Improvements to WRC to achieve new phosphorus permit.
Draycott WRC - Phosphorus Removal
Due 2029-30Axe - Cocklake to Brean Cross Sluice
08WW102039 · aHD_IMP_NNImprovement
Improvements to WRC to achieve tightened phosphorus permit.
Evercreech WRC - Phosphorus Removal
Due 2029-30Alham
08WW102040 · aHD_IMP_NNImprovement
Improvements to WRC to achieve tightened phosphorus permit.
Glastonbury WRC - Phosphorus Removal
Due 2029-30GLASTONBURY THE BECKERY STORM TANK
08WW101002 · cvEnvAct_IMP2Improvement
EnvAct_IMP4cv. Storm overflows - Frequency improvements
MEARE WASTEWATER TREATMENT WORKS SO improvement (13202S)
Due 2029-30Brue - Clyce Hole to conf North Drain
08WW100225 · aWFD_IMP_CHEMImprovement
Improvements to WRC to achieve tightened chemical permit.
Shepton Mallet WRC - Chemical Improvements
Due 2029-30Sheppey
08WW102041 · aHD_IMP_NNImprovement
Improvements to WRC to achieve tightened phosphorus permit.
Shepton Mallet WRC - Phosphorus Removal
Due 2029-30Sheppey
08WW102042 · aWFD_IMPgImprovement
Improvements to WRC to achieve new phosphorus permit.
Wedmore WRC - Phosphorus Removal
Due 2029-30Axe - Cocklake to Brean Cross Sluice
08WW102043 · aHD_IMP_NNImprovement
Improvements to WRC to achieve tightened phosphorus permit.
Wells WRC - Phosphorus Removal
Due 2029-30Keward Brook
08WW101002 · dpEnvAct_IMP2Improvement
EnvAct_IMP4dp. Storm overflows - Frequency improvements
WINSCOMBE WWTW SO improvement (13351S)
Due 2029-30Lox Yeo - source to conf Rive Axe
08WW103015 · aWFD_IMPgImprovement
Improvements to WRC to achieve new phosphorus permit.
Wookey WRC - Phosphorus Removal
Due 2029-30Axe - source to Cocklake

73 of 73 measures shown. A measure whose completion date has passed is shown as Complete; the water company's actual delivery against it is reported to the regulator but not published here.

There is no public change log

The live WINEP spreadsheet is internal, and there is no versioned public comparison or published reasons when a measure is re-dated or dropped. The only way to hold slippage to account is to archive every annual release and diff it yourself.

The 2027 pressure point

Most investigations must complete by 30 April 2027 to feed the 2030–35 programme. That date — not 2030 — is the one to hold: an investigation that slips past it cannot shape the next round of funded schemes.