← Edington Broadmead Lane (som)

Spill evidence · River Hub

Edington Broadmead Lane (som)

Pumping station overflow · WXW00193 · feeds BURNHAM-ON-SEA / HIGHBRIDGE STW
Dry spill

Evidence strength

Medium confidence
  • ✓ Dry on the EA 1-day window
  • ✓ Rain gauge close (≤5 km)
  • ✓ Monitor 100% operational that year
  • ⚠ Short discharge (<1 h) — weaker signal

The discharge

Spill day
Friday, 28 February 2025
Started
28 Feb 2025, 23:08
Ended
1 Mar 2025, 00:00
Duration
52 minutes
Receiving water
South Drain
Parish
Edington

Rainfall evidence

Daily rainfall at the matched gauge (Gold Corner) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Dry spill3-day window: Wet weather4-day window: Wet weather
DateRainfall
28/02/2025 (spill day)0.076 mmdry
27/02/20250 mmdry
26/02/20250.895 mmrain
25/02/20258.686 mmrain
24/02/20251.377 mmrain

River flow that day: 10.725 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 3.5 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
Unknown (no works overflow data)
EA annual return (2025)
49 counted spills · 991 h total
Monitor uptime (2025)
100% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet WXW00193). Rainfall: EA Hydrology gauge 40e8abd2-f395-42c8-95b1-b22c3348b0b5_405278. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Brue and Axe Data.
Spill evidence — Edington Broadmead Lane (som) — River Brue and Axe Data