← Butleigh Storm Tank

Spill evidence · River Hub

Butleigh Storm Tank

Storm overflow at the works · WXW00218 · feeds BUTLEIGH STW
Wet weather

The discharge

Spill day
Monday, 9 March 2026
Started
9 Mar 2026, 01:23
Ended
9 Mar 2026, 01:49
Duration
26 minutes
Receiving water
Brue - Tootle Bridge to Clyse Hole
Parish
Butleigh

Rainfall evidence

Daily rainfall at the matched gauge (Somerton) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
09/03/2026 (spill day)0.009 mmdry
08/03/20264.013 mmrain
07/03/20260.871 mmrain
06/03/20260 mmdry
05/03/20260.006 mmdry

River flow that day: 5.954 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 6.8 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet WXW00218). Rainfall: EA Hydrology gauge 52a0e101-be9f-4680-aa58-529b7e728d84. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Brue and Axe Data.
Spill evidence — Butleigh Storm Tank — River Brue and Axe Data