← Butleigh Storm Tank
Spill evidence · River Hub
Butleigh Storm Tank
Storm overflow at the works · WXW00218 · feeds BUTLEIGH STW
Wet weather
The discharge
- Spill day
- Tuesday, 10 March 2026
- Started
- 10 Mar 2026, 00:02
- Ended
- 10 Mar 2026, 01:12
- Duration
- 1 hour 10 minutes
- Receiving water
- Brue - Tootle Bridge to Clyse Hole
- Parish
- Butleigh
Rainfall evidence
Daily rainfall at the matched gauge (Somerton) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.
1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
| Date | Rainfall | |
|---|---|---|
| 10/03/2026 (spill day) | 0.966 mm | rain |
| 09/03/2026 | 0.009 mm | dry |
| 08/03/2026 | 4.013 mm | rain |
| 07/03/2026 | 0.871 mm | rain |
| 06/03/2026 | 0 mm | dry |
River flow that day: 5.65 m³/s. Verify at the EA rainfall station.
Gauge proximity
Outlet (red) vs matched rain gauge (blue), 6.8 km apart. Closer means the rainfall reading is more representative of the overflow.
Loading map…
Severity & context
- Bathing water
- Not Applicable
- Shellfish water
- Not Applicable
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet WXW00218). Rainfall: EA Hydrology gauge 52a0e101-be9f-4680-aa58-529b7e728d84. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Brue and Axe Data.