← Butleigh Storm Tank

Spill evidence · River Hub

Butleigh Storm Tank

Storm overflow at the works · WXW00218 · feeds BUTLEIGH STW
Dry spill

Evidence strength

Low confidence
  • ✓ Dry on the EA 1-day window
  • ✓ Monitor 99% operational that year
  • ⚠ Short discharge (<1 h) — weaker signal

The discharge

Spill day
Wednesday, 23 October 2024
Started
23 Oct 2024, 00:34
Ended
23 Oct 2024, 00:58
Duration
24 minutes
Receiving water
Brue - Tootle Bridge to Clyse Hole
Parish
Butleigh

Rainfall evidence

Daily rainfall at the matched gauge (Somerton) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Dry spill3-day window: Wet weather4-day window: Wet weather
DateRainfall
23/10/2024 (spill day)0.146 mmdry
22/10/20240.049 mmdry
21/10/20240 mmdry
20/10/20240.404 mmrain
19/10/20241.195 mmrain

River flow that day: 6.689 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 6.8 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
EA annual return (2024)
132 counted spills · 2305 h total
Monitor uptime (2024)
99% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet WXW00218). Rainfall: EA Hydrology gauge 52a0e101-be9f-4680-aa58-529b7e728d84. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Brue and Axe Data.
Spill evidence — Butleigh Storm Tank — River Brue and Axe Data