← Street Farm Lane

Spill evidence · River Hub

Street Farm Lane

Combined sewer overflow · WXW00417 · feeds GLASTONBURY STW
Wet weather

The discharge

Spill day
Thursday, 4 January 2024
Started
4 Jan 2024, 16:20
Ended
4 Jan 2024, 22:20
Duration
6 hours
Receiving water
South Drain
Parish
Street

Rainfall evidence

Daily rainfall at the matched gauge (Somerton) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
04/01/2024 (spill day)31.826 mmrain
03/01/20242.557 mmrain
02/01/20243.543 mmrain
01/01/202411.219 mmrain
31/12/20232.915 mmrain

River flow that day: 41.808 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 7.4 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
Yes — the treatment works' own overflow stayed shut that day, so capacity was available. Avoidable.
EA annual return (2024)
19 counted spills · 57 h total
Monitor uptime (2024)
100% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet WXW00417). Rainfall: EA Hydrology gauge 52a0e101-be9f-4680-aa58-529b7e728d84. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Brue and Axe Data.
Spill evidence — Street Farm Lane — River Brue and Axe Data