← Baltonsborough Main 1

Spill evidence · River Hub

Baltonsborough Main 1

Pumping station overflow · WXW00102 · feeds BUTLEIGH STW
Wet weather

The discharge

Spill day
Tuesday, 9 December 2025
Started
9 Dec 2025, 12:25
Ended
9 Dec 2025, 12:43
Duration
17 minutes 30 seconds
Receiving water
Brue - Tootle Bridge to Clyse Hole
Parish
Baltonsborough

Rainfall evidence

Daily rainfall at the matched gauge (Somerton) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
09/12/2025 (spill day)2.347 mmrain
08/12/202510.714 mmrain
07/12/20252.027 mmrain
06/12/20252.89 mmrain
05/12/202510.825 mmrain

River flow that day: 69.563 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 7.7 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
Yes — the treatment works' own overflow stayed shut that day, so capacity was available. Avoidable.
EA annual return (2025)
33 counted spills · 156 h total
Monitor uptime (2025)
100% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet WXW00102). Rainfall: EA Hydrology gauge 52a0e101-be9f-4680-aa58-529b7e728d84. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Brue and Axe Data.