← Locking Village

Spill evidence · River Hub

Locking Village

Pumping station overflow · WXW00632 · feeds WESTON SUPER MARE STW
Wet weather

The discharge

Spill day
Monday, 24 November 2025
Started
24 Nov 2025, 05:10
Ended
24 Nov 2025, 07:39
Duration
2 hours 29 minutes
Receiving water
Uphill Great Rhyne - source to conf R Axe Estuary
Parish
Locking

Rainfall evidence

Daily rainfall at the matched gauge (Wick St Lawrence) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
24/11/2025 (spill day)0 mmdry
23/11/202512.118 mmrain
22/11/202512.356 mmrain
21/11/20251.65 mmrain
20/11/20250 mmdry

River flow that day: 9.603 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 6.2 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
Unknown (no works overflow data)
EA annual return (2025)
6 counted spills · 28 h total
Monitor uptime (2025)
100% operational

⚠ Coastal / tidal location — very short discharges around high tide can be monitor artefacts; corroborate with tide times before relying on short events here.

Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet WXW00632). Rainfall: EA Hydrology gauge ec5cad4f-165a-4b89-a49d-6aa36fd9c940. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Brue and Axe Data.