Why it keeps happening
Three things we can measure in the data. None of them proves a cause on its own, but each points at a different kind of infrastructure problem.
A discharge in dry weather is not an exceptional circumstance, so it is not permitted on any reading of regulation 4.
See the 34 →A strong signal, not a finding. We cannot see whether flow is transferred to another works for treatment, and the permitted figure is not always published.
See the 0 →Rainfall across the catchment does not explain a discharge that an overflow's own treatment works did not share.
See the 141 →Where the indicators concentrate
| Overflow | Hours | Dry | What it points to | Verdict |
|---|---|---|---|---|
| Wingfield Church Lane | 516 | 18 | Dry spilling | No action |
| Chew Stoke Walley Court Road Storm Tank | 2,397 | 662 | High spill frequency | On record |
| Compton Bassett the Pond | 1,495 | 17 | Very long spills | No action |
| Tetbury Storm Tank | 1,476 | 159 | Very long spills | No action |
| Nunney Storm Tank | 1,378 | 124 | Very long spills | No action |
| Hullavington Storm Tank | 1,256 | 122 | Very long spills | No action |
| East Harptree Storm Tank | 1,250 | 86 | Very long spills | No action |
| Doynton Inlet | 1,147 | 148 | Very long spills | No action |
| Sutton Benger Inlet | 765 | 325 | High spill frequency | No action |
| Biddestone Manor Cottages | 115 | 29 | Dry spilling | No action |
Hours are the last full year; dry spills are since 2020. Verdict is whether a measure is linked to the overflow — see the gaps.
What this analysis cannot see
These indicators are measured from spill timing and rainfall alone. They cannot see misconnections, the quality of effluent from a works that is running normally, flow transferred between works for treatment, a company's maintenance history, or the periods when a monitor was offline. Because a quiet monitor records nothing, every count here is a floor, not a total.