← Leopold Road, Church Path

Spill evidence · River Hub

Leopold Road, Church Path

Combined sewer overflow · TWL00265 · feeds LONDON (Becton STW)
Dry spill

Evidence strength

High confidence
  • ✓ Sustained discharge (≥1 h)
  • ✓ Dry across a 4-day antecedent window
  • ✓ Rain gauge close (≤5 km)

The discharge

Spill day
Tuesday, 23 June 2026
Started
23 Jun 2026, 03:30
Ended
23 Jun 2026, 05:00
Duration
1 hour 30 minutes
Receiving water
Lower Brent
Parish
—

Rainfall evidence

Daily rainfall at the matched gauge (The Avenue North) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Dry spill3-day window: Dry spill4-day window: Dry spill
DateRainfall
23/06/2026 (spill day)0.2 mmdry
22/06/20260 mmdry
21/06/20260 mmdry
20/06/20260 mmdry
19/06/20260 mmdry

River flow that day: 0.841 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 3.4 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
Unknown (no works overflow data)
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet TWL00265). Rainfall: EA Hydrology gauge 9e7b5b83-246b-4f55-b094-fbb3c30447db. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Brent Data.