← Leopold Road, Church Path

Spill evidence · River Hub

Leopold Road, Church Path

Combined sewer overflow · TWL00265 · feeds LONDON (Becton STW)
Dry spill

Evidence strength

Medium confidence
  • ✓ Dry on the EA 1-day window
  • ✓ Rain gauge close (≤5 km)
  • ✓ Monitor 100% operational that year
  • ⚠ Short discharge (<1 h) — weaker signal

The discharge

Spill day
Friday, 14 November 2025
Started
14 Nov 2025, 11:45
Ended
14 Nov 2025, 12:15
Duration
30 minutes
Receiving water
Lower Brent
Parish
—

Rainfall evidence

Daily rainfall at the matched gauge (The Avenue North) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Dry spill3-day window: Wet weather4-day window: Wet weather
DateRainfall
14/11/2025 (spill day)0 mmdry
13/11/20250.2 mmdry
12/11/20250 mmdry
11/11/20250.6 mmrain
10/11/20255 mmrain

River flow that day: 22.245 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 3.4 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
Unknown (no works overflow data)
EA annual return (2025)
24 counted spills · 47 h total
Monitor uptime (2025)
100% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet TWL00265). Rainfall: EA Hydrology gauge 9e7b5b83-246b-4f55-b094-fbb3c30447db. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Brent Data.
Spill evidence — Leopold Road, Church Path — River Brent Data