← Leopold Road, Church Path

Spill evidence · River Hub

Leopold Road, Church Path

Combined sewer overflow · TWL00265 · feeds LONDON (Becton STW)
Wet weather

The discharge

Spill day
Wednesday, 1 January 2025
Started
1 Jan 2025, 15:45
Ended
1 Jan 2025, 16:30
Duration
45 minutes
Receiving water
Lower Brent
Parish
—

Rainfall evidence

Daily rainfall at the matched gauge (The Avenue North) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
01/01/2025 (spill day)9 mmrain
31/12/20240 mmdry
30/12/20240 mmdry
29/12/20240 mmdry
28/12/20240.2 mmdry

River flow that day: 9.448 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 3.4 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
Unknown (no works overflow data)
EA annual return (2025)
24 counted spills · 47 h total
Monitor uptime (2025)
100% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet TWL00265). Rainfall: EA Hydrology gauge 9e7b5b83-246b-4f55-b094-fbb3c30447db. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Brent Data.
Spill evidence — Leopold Road, Church Path — River Brent Data