← Highfield Road Jct With Brookside Road

Spill evidence · River Hub

Highfield Road Jct With Brookside Road

Combined sewer overflow · TWL00225 · feeds LONDON (Mogden STW)
Wet weather

The discharge

Spill day
Monday, 12 May 2025
Started
12 May 2025, 17:00
Ended
12 May 2025, 17:45
Duration
45 minutes
Receiving water
Dollis Brook and Upper Brent
Parish
—

Rainfall evidence

Daily rainfall at the matched gauge (The Avenue North) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
12/05/2025 (spill day)4.4 mmrain
11/05/20250 mmdry
10/05/20250 mmdry
09/05/20250 mmdry
08/05/20250 mmdry

River flow that day: 2.031 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 5.8 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
Unknown (no works overflow data)
EA annual return (2025)
2 counted spills · 4 h total
Monitor uptime (2025)
100% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet TWL00225). Rainfall: EA Hydrology gauge 9e7b5b83-246b-4f55-b094-fbb3c30447db. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Brent Data.