← Mays Lane Overflow

Spill evidence · River Hub

Mays Lane Overflow

Combined sewer overflow · TWL00648 · feeds LONDON (Deepham STW)
Wet weather

The discharge

Spill day
Sunday, 28 April 2024
Started
28 Apr 2024, 03:36
Ended
28 Apr 2024, 14:48
Duration
11 hours 12 minutes
Receiving water
Dollis Brook and Upper Brent
Parish
—

Rainfall evidence

Daily rainfall at the matched gauge (North Mymms) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
28/04/2024 (spill day)1.2 mmrain
27/04/202425.2 mmrain
26/04/20244.2 mmrain
25/04/20241.4 mmrain
24/04/20240 mmdry

River flow that day: 3.637 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 8.6 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
Unknown (no works overflow data)
EA annual return (2024)
67 counted spills · 279 h total
Monitor uptime (2024)
98% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet TWL00648). Rainfall: EA Hydrology gauge 5b6746aa-c76a-4ea2-8903-5aa5bb759035. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Brent Data.