← Colin Crescent, Colindale

Spill evidence · River Hub

Colin Crescent, Colindale

Combined sewer overflow · TWL00527 · feeds LONDON (Mogden STW)
Wet weather

The discharge

Spill day
Sunday, 8 December 2024
Started
8 Dec 2024, 11:15
Ended
8 Dec 2024, 22:00
Duration
10 hours 45 minutes
Receiving water
Silk Stream and Edgware Brook
Parish
—

Rainfall evidence

Daily rainfall at the matched gauge (The Avenue North) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.

1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
DateRainfall
08/12/2024 (spill day)4.6 mmrain
07/12/20249 mmrain
06/12/20245.2 mmrain
05/12/20245.6 mmrain
04/12/20245.4 mmrain

River flow that day: 9.94 m³/s. Verify at the EA rainfall station.

Gauge proximity

Outlet (red) vs matched rain gauge (blue), 3.6 km apart. Closer means the rainfall reading is more representative of the overflow.

Loading map…

Severity & context

Bathing water
Not Applicable
Shellfish water
Not Applicable
Ahead of the works
Unknown (no works overflow data)
EA annual return (2024)
48 counted spills · 327 h total
Monitor uptime (2024)
100% operational
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet TWL00527). Rainfall: EA Hydrology gauge 9e7b5b83-246b-4f55-b094-fbb3c30447db. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Brent Data.