← Church Road/brent Lodge Park (bunny Park)
Spill evidence · River Hub
Church Road/brent Lodge Park (bunny Park)
Combined sewer overflow · TWL00521 · feeds LONDON (Mogden STW)
Wet weather
The discharge
- Spill day
- Thursday, 14 May 2026
- Started
- 14 May 2026, 04:10
- Ended
- 14 May 2026, 11:08
- Duration
- 6 hours 58 minutes
- Receiving water
- Lower Brent
- Parish
- —
Rainfall evidence
Daily rainfall at the matched gauge (Raf Northolt) for the spill day and the days before. A spill is dry when every day in the window is ≤ 0.25 mm.
1-day window: Wet weather3-day window: Wet weather4-day window: Wet weather
| Date | Rainfall | |
|---|---|---|
| 14/05/2026 (spill day) | 0.2 mm | dry |
| 13/05/2026 | 10.4 mm | rain |
| 12/05/2026 | 0 mm | dry |
| 11/05/2026 | 0 mm | dry |
| 10/05/2026 | 0 mm | dry |
River flow that day: 1.242 m³/s. Verify at the EA rainfall station.
Gauge proximity
Outlet (red) vs matched rain gauge (blue), 6.3 km apart. Closer means the rainfall reading is more representative of the overflow.
Loading map…
Severity & context
- Bathing water
- Not Applicable
- Shellfish water
- Not Applicable
- Ahead of the works
- Unknown (no works overflow data)
Method & provenance. Dry/wet classification is decided by rainfall at the nearest EA gauge — ≤ 0.25 mm on the spill day and each preceding day of the window (how we classify). Spill data: Environment Agency EDM (outlet TWL00521). Rainfall: EA Hydrology gauge 62a067ad-54c1-4a8c-bf8a-446cbbcc7e2e. A dry spill is precautionary evidence of a likely fault, not proof of an offence — we test the rainfall, not the works' flow. Generated by River Brent Data.